Installing the Switch
101
3. Repeat
for all installed fabric cards and fabric card fillers.
4. Power on the line cards.
See
“Enable the Line Cards for Installation” on page 102
Related Information
■
Switch Command Reference
,
fruinfo
command
■
“Display the CMC FRU ID Information” on page 88
■
“Display the Power Supply FRU ID Information” on page 91
■
“Display the Line Card FRU ID Information” on page 107
■
“Display the InfiniBand Cable FRU ID Information” on page 118
Powering On the Line Cards
After powering on the fabric cards, perform these tasks in the following order to
power on and verify the line cards:
Product Info Area:
Version = 1
Language Code = 25
Manufacturer Name = Sun Microsystems, Inc.
Product Name = Sun Datacenter Switch DCS 648 - Fabric Card
Product Part / Model# = 541-3811-04
Product Version = Rev 1
Product Serial Number = 0110SJC-0918FC0231
Asset Tag = none
FRU Programmer File ID = m9_fc_fru-info-0110SJC-0918FC0231.inf
#
Step
Description
Links
1.
Enable the line cards.
“Enable the Line Cards for Installation” on
page 102
2.
Power on the line cards.
“Power On the Line Cards for Installation”
on page 103
3.
Check the line card status LEDs.
“Check the Line Card Status LEDs” on
page 103
4.
Verify the line card status.
Содержание Sun Datacenter InfiniBand Switch 648
Страница 1: ...Sun Datacenter InfiniBand Switch 648 Installation Guide Part No 820 7738 12 May 2010 Revision A ...
Страница 8: ...viii Sun Datacenter InfiniBand Switch 648 Installation Guide May 2010 ...
Страница 134: ...124 Sun Datacenter InfiniBand Switch 648 Installation Guide May 2010 ...
Страница 140: ...130 Sun Datacenter InfiniBand Switch 648 Installation Guide May 2010 ...