Installing the Switch
103
▼
Power On the Line Cards for Installation
Caution –
You must fully power on all fabric cards and fabric card fillers before
powering on the line cards. See
“Power On the Fabric Cards for Installation” on
.
1. Identify the prerequisite and subsequent tasks you must perform in
conjunction with this procedure, to install the switch.
See the table in
“Installation Sequence” on page 20
2. On the CMC, type:
where
slot
is the slot number of the installed line cards (
0
–
8
).
When a line card is activated, the OK LED is illuminated and the line card goes to
full power.
3. Repeat
for each installed line card.
4. Verify the line card status LEDs indicate a normal start up to full power.
The OK LED should be lit and the Attention LED should be unlit. See
Line Card Status LEDs” on page 103
Related Information
■
Switch Command Reference
,
activate
command
■
“Enable the Line Cards for Installation” on page 102
■
“Power On the Fabric Cards for Installation” on page 96
▼
Check the Line Card Status LEDs
1. Identify the prerequisite and subsequent tasks you must perform in
conjunction with this procedure, to install the switch.
See the table in
“Installation Sequence” on page 20
2. Visually inspect the line card status LEDs.
#
activate lc
slot
Содержание Sun Datacenter InfiniBand Switch 648
Страница 1: ...Sun Datacenter InfiniBand Switch 648 Installation Guide Part No 820 7738 12 May 2010 Revision A ...
Страница 8: ...viii Sun Datacenter InfiniBand Switch 648 Installation Guide May 2010 ...
Страница 134: ...124 Sun Datacenter InfiniBand Switch 648 Installation Guide May 2010 ...
Страница 140: ...130 Sun Datacenter InfiniBand Switch 648 Installation Guide May 2010 ...