Sun Datacenter InfiniBand Switch 648 Installation Guide • May 2010
3. Compare what you see to the following table.
4. Verify line card status.
See
“Verify the Line Card Status” on page 104
Related Information
■
Switch Administration
, checking status LEDs
■
“Check the Power Supply Status LEDs” on page 80
■
“Check the CMC Status LEDs” on page 80
■
“Check the Fabric Card Status LEDs” on page 96
■
“Check the CXP Connector Status LEDs” on page 115
▼
Verify the Line Card Status
1. Identify the prerequisite and subsequent tasks you must perform in
conjunction with this procedure, to install the switch.
See the table in
“Installation Sequence” on page 20
.
2. On the CMC, verify that the installed line cards are active:
If an installed line card is shown to be
INACTIVE
, investigate why.
Glyph
Location Name
Color
State and Meaning
Top
Locator
White
On – No function.
Off – Normal operation.
Flashing – The line card is identifying itself.
Middle Attention
Amber
On – A fault or critical error has been detected.
Off – Normal operation.
Flashing – No function.
Bottom OK
Ready-to-
Remove
Green
On – Normal operation at full power.
Off – No power at all applied.
Flashing – Fabric card has been disabled and is ready to be
removed, standby voltage available.
#
showpresent | grep LC
Содержание Sun Datacenter InfiniBand Switch 648
Страница 1: ...Sun Datacenter InfiniBand Switch 648 Installation Guide Part No 820 7738 12 May 2010 Revision A ...
Страница 8: ...viii Sun Datacenter InfiniBand Switch 648 Installation Guide May 2010 ...
Страница 134: ...124 Sun Datacenter InfiniBand Switch 648 Installation Guide May 2010 ...
Страница 140: ...130 Sun Datacenter InfiniBand Switch 648 Installation Guide May 2010 ...