Install the SCC PROM
Caution -
This procedure requires that you handle components that are sensitive to electrostatic
discharge. This discharge can cause failure of server components.
1.
Orient the SCC PROM properly onto the main module.
2.
Press down on the SCC PROM until it is completely seated on the main module.
3.
Insert the main module back into the server.
“Install the Main Module” on page 102
4.
Return the server to operation. See
.
Related Information
■
“Remove the SCC PROM” on page 125
■
“Verify the SCC PROM” on page 128
Servicing the SCC PROM
127
Содержание SPARC T8-4
Страница 1: ...SPARC T8 4 Server Service Manual Part No E80512 05 January 2022 ...
Страница 2: ......
Страница 10: ...10 SPARC T8 4 Server Service Manual January 2022 ...
Страница 12: ...12 SPARC T8 4 Server Service Manual January 2022 ...
Страница 24: ...24 SPARC T8 4 Server Service Manual January 2022 ...
Страница 42: ...42 SPARC T8 4 Server Service Manual January 2022 ...
Страница 116: ...116 SPARC T8 4 Server Service Manual January 2022 ...
Страница 133: ...Verify the Battery Related Information Replace the Battery on page 129 Servicing the Battery 133 ...
Страница 134: ...134 SPARC T8 4 Server Service Manual January 2022 ...
Страница 149: ...Remove a Fan Module 3 Press the green button to disengage the fan module from the chassis Servicing Fan Modules 149 ...
Страница 154: ...154 SPARC T8 4 Server Service Manual January 2022 ...
Страница 165: ...Remove a PCIe Card 2 Unlatch and open the PCIe card carrier top cover Servicing PCIe Cards 165 ...
Страница 190: ...190 SPARC T8 4 Server Service Manual January 2022 ...
Страница 198: ...198 SPARC T8 4 Server Service Manual January 2022 ...
Страница 204: ...204 SPARC T8 4 Server Service Manual January 2022 ...