Server Overview
Step Description
Links
“Rear Panel Components” on page 13
5.
Take safety and ESD precautions and assemble the required
tools.
“Handling Precautions” on page 17
“Tools Needed for Installation” on page 18
6.
Install any optional components into the server.
“Optional Components” on page 25
7.
Install the server into a rack.
“Installing the Server” on page 25
8.
Attach data and management cables to the server.
9.
Connect the power cords to the server, configure the Oracle
ILOM on the SP, power on the server for the first time, and set
up the operating system.
“Powering On the Server for the First Time” on page 51
Related Information
■
SPARC T8 Series Servers Product Notes
■
SPARC T8-1 Server Safety and Compliance Guide
■
SPARC T8 Series Servers Administration Guide
■
SPARC T8-1 Server Service Manual
Server Overview
This topic provides a high-level introduction to the main components and capabilities of the
server.
10
SPARC T8-1 Server Installation Guide • June 2019
Содержание SPARC T8-1
Страница 1: ...SPARC T8 1 Server Installation Guide Part No E80507 03 June 2019 ...
Страница 2: ......
Страница 8: ...8 SPARC T8 1 Server Installation Guide June 2019 ...
Страница 24: ...24 SPARC T8 1 Server Installation Guide June 2019 ...
Страница 49: ...Verify Operation of Slide Rails and CMA Secure Cables to the CMA on page 60 Installing the Server 49 ...
Страница 50: ...50 SPARC T8 1 Server Installation Guide June 2019 ...
Страница 72: ...72 SPARC T8 1 Server Installation Guide June 2019 ...
Страница 76: ...76 SPARC T8 1 Server Installation Guide June 2019 ...