Powering On the Server for the First Time
These topics include instructions for powering on the server for the first time and configuring
the Oracle Solaris OS.
Step
Description
Links
1.
Connect cables to the server. Ensure you connect
the SER MGT port to a terminal before you
connect the power cords.
“Identifying Ports” on page 55
2.
If using a CMA, connect cables to it now.
“Secure Cables to the CMA” on page 60
4.
Power on the server and start the Oracle ILOM
system console.
“Power on the System for the First Time” on page 61
5.
Configure the preinstalled OS, or install a fresh
OS.
“Installing the OS” on page 62
6. (Optional)
Configure the NET MGT port to use a static IP
address.
“Assign a Static IP Address to the NET MGT Port” on page 68
7. (Optional)
Activate Oracle Auto Service Request for the
server.
“Oracle Auto Service Request Software Activation” on page 70
Related Information
■
“Preparing for Installation” on page 15
■
“Installing the Server” on page 25
■
Connect Cables
1.
Connect a Category 5 (or better) RJ-45 cable from the SER MGT port to a
terminal device.
Caution -
Do not attach a modem to this port.
Powering On the Server for the First Time
51
Содержание SPARC T8-1
Страница 1: ...SPARC T8 1 Server Installation Guide Part No E80507 03 June 2019 ...
Страница 2: ......
Страница 8: ...8 SPARC T8 1 Server Installation Guide June 2019 ...
Страница 24: ...24 SPARC T8 1 Server Installation Guide June 2019 ...
Страница 49: ...Verify Operation of Slide Rails and CMA Secure Cables to the CMA on page 60 Installing the Server 49 ...
Страница 50: ...50 SPARC T8 1 Server Installation Guide June 2019 ...
Страница 72: ...72 SPARC T8 1 Server Installation Guide June 2019 ...
Страница 76: ...76 SPARC T8 1 Server Installation Guide June 2019 ...