Preparing for Installation
These topics detail the precautions to follow and the tools to assemble prior to installing the
server.
Step
Description
Links
1.
Confirm that you received all the items you ordered.
2.
Review safety and ESD precautions
“Handling Precautions” on page 17
3.
Verify that you have the correct tools.
“Tools Needed for Installation” on page 18
Related Information
■
“Installing the Server” on page 25
■
■
“Powering On the Server for the First Time” on page 51
Shipping Kit
Note -
When you receive your server, place it in the environment where you will install it.
Leave it in its shipping crate at its final destination for 24 hours. This resting period prevents
thermal shock and condensation.
Verify that you received all of the components that ship with your server.
Preparing for Installation
15
Содержание SPARC T8-1
Страница 1: ...SPARC T8 1 Server Installation Guide Part No E80507 03 June 2019 ...
Страница 2: ......
Страница 8: ...8 SPARC T8 1 Server Installation Guide June 2019 ...
Страница 24: ...24 SPARC T8 1 Server Installation Guide June 2019 ...
Страница 49: ...Verify Operation of Slide Rails and CMA Secure Cables to the CMA on page 60 Installing the Server 49 ...
Страница 50: ...50 SPARC T8 1 Server Installation Guide June 2019 ...
Страница 72: ...72 SPARC T8 1 Server Installation Guide June 2019 ...
Страница 76: ...76 SPARC T8 1 Server Installation Guide June 2019 ...