2-6
SPARC Enterprise M4000/M5000 Servers Installation Guide • February 2012
For a dual-power feed connection, connect the individual power cords separately to
each AC power supply system.
FIGURE 2-3
SPARC Enterprise M4000 Server With Dual-power Feed Connection
PSU#0 PSU#1
#0
#1
Circuit
breaker
Circuit
breaker
Содержание SPARC Enterprise M4000
Страница 4: ......
Страница 8: ...viii SPARC Enterprise M4000 M5000 Servers Installation Guide February 2012 ...
Страница 14: ...xiv SPARC Enterprise M4000 M5000 Servers Installation Guide February 2012 ...
Страница 26: ...2 10 SPARC Enterprise M4000 M5000 Servers Installation Guide February 2012 ...
Страница 58: ...A 14 SPARC Enterprise M4000 M5000 Servers Installation Guide February 2012 ...