Install the Server (2-Post, 19-Inch Hardmount Rack Kit)
Use two M3 x 8 SEM screws for each rear plate. The position varies depending on the
thickness of the rail in the rack. For example, this figure shows where to install the screws
for the optimum rack position on the rear plate.
b.
Slide the rear plate in so that the screws slide into position into one set of
the eyelets.
56
Netra SPARC S7-2 Server Installation Guide • January 2017
Содержание Netra SPARC S7-2
Страница 1: ...Netra SPARC S7 2 Server Installation Guide Part No E73206 03 January 2017 ...
Страница 2: ......
Страница 8: ...8 Netra SPARC S7 2 Server Installation Guide January 2017 ...
Страница 10: ...10 Netra SPARC S7 2 Server Installation Guide January 2017 ...
Страница 26: ...26 Netra SPARC S7 2 Server Installation Guide January 2017 ...
Страница 60: ...60 Netra SPARC S7 2 Server Installation Guide January 2017 ...
Страница 96: ...96 Netra SPARC S7 2 Server Installation Guide January 2017 ...
Страница 102: ...102 Netra SPARC S7 2 Server Installation Guide January 2017 ...