Assemble the DC Input Power Cords
14.
Install the terminal housing cover.
15.
Insert the completed power supply unit into the server.
16.
Repeat this procedure to create as many DC power supply units as you need for
your system.
17.
Connect the DC power source.
“Connect DC Power Source” on page 80
.
Powering On the Server for the First Time
79
Содержание Netra SPARC S7-2
Страница 1: ...Netra SPARC S7 2 Server Installation Guide Part No E73206 03 January 2017 ...
Страница 2: ......
Страница 8: ...8 Netra SPARC S7 2 Server Installation Guide January 2017 ...
Страница 10: ...10 Netra SPARC S7 2 Server Installation Guide January 2017 ...
Страница 26: ...26 Netra SPARC S7 2 Server Installation Guide January 2017 ...
Страница 60: ...60 Netra SPARC S7 2 Server Installation Guide January 2017 ...
Страница 96: ...96 Netra SPARC S7 2 Server Installation Guide January 2017 ...
Страница 102: ...102 Netra SPARC S7 2 Server Installation Guide January 2017 ...