Remove the Cable Management Arm
a.
Press the green release tab (callout 1) on the slide-rail latching bracket
toward the left and slide the connector D out of the left slide-rail [frames 1
and 2].
When you slide connector D out of the left slide-rail, the slide-rail latching bracket portion
of the connector remains in place. You will disconnect it in the next step.
Note -
Once you have disconnected connector D, do not allow the CMA to hang under its own
weight. Throughout the remainder of this procedure, the CMA must be supported until all the
remaining connectors are disconnected and the CMA can be placed on a flat surface.
b.
Use your right hand to support the CMA.
Installing the Storage Server Into a Rack
55
Содержание Exadata Storage Server X6-2 High Capacity
Страница 1: ...Oracle Exadata Storage Server X6 2 High Capacity Installation Guide Part No E63691 03 July 2018 ...
Страница 2: ......
Страница 8: ...8 Oracle Exadata Storage Server X6 2 High Capacity Installation Guide July 2018 ...
Страница 24: ...24 Oracle Exadata Storage Server X6 2 High Capacity Installation Guide July 2018 ...
Страница 64: ...64 Oracle Exadata Storage Server X6 2 High Capacity Installation Guide July 2018 ...
Страница 68: ...68 Oracle Exadata Storage Server X6 2 High Capacity Installation Guide July 2018 ...