Install the Cable Management Arm
Route the cables through the cable troughs in this order:
a.
First through the front-most cable trough.
b.
Then through the small cable trough.
c.
Then through the rear-most cable trough
Note -
When securing the cables with the Velcro straps located on the front slide bar, ensure
that the Velcro straps do not wrap around the bottom of the slide bar; otherwise, expansion and
contraction of the slide bar might be hindered when the storage server is extended from the rack
and returned to the rack.
17.
Ensure that the secured cables do no extend above the top or below the bottom
of the storage server to which they are attached; otherwise, the cables might
snag on other equipment installed in the rack when the storage server is
extended from the rack or returned to the rack.
Installing the Storage Server Into a Rack
51
Содержание Exadata Storage Server X6-2 High Capacity
Страница 1: ...Oracle Exadata Storage Server X6 2 High Capacity Installation Guide Part No E63691 03 July 2018 ...
Страница 2: ......
Страница 8: ...8 Oracle Exadata Storage Server X6 2 High Capacity Installation Guide July 2018 ...
Страница 24: ...24 Oracle Exadata Storage Server X6 2 High Capacity Installation Guide July 2018 ...
Страница 64: ...64 Oracle Exadata Storage Server X6 2 High Capacity Installation Guide July 2018 ...
Страница 68: ...68 Oracle Exadata Storage Server X6 2 High Capacity Installation Guide July 2018 ...