Install the Cable Management Arm
The connector B tab (see callout 1) goes into the slide-rail's front slot (callout 2).
b.
Gently tug on the right side of the front slide bar to verify that connector B is
properly seated.
9.
To install the CMA's connector C into the right slide-rail:
Installing the Storage Server Into a Rack
45
Содержание Exadata Storage Server X6-2 High Capacity
Страница 1: ...Oracle Exadata Storage Server X6 2 High Capacity Installation Guide Part No E63691 03 July 2018 ...
Страница 2: ......
Страница 8: ...8 Oracle Exadata Storage Server X6 2 High Capacity Installation Guide July 2018 ...
Страница 24: ...24 Oracle Exadata Storage Server X6 2 High Capacity Installation Guide July 2018 ...
Страница 64: ...64 Oracle Exadata Storage Server X6 2 High Capacity Installation Guide July 2018 ...
Страница 68: ...68 Oracle Exadata Storage Server X6 2 High Capacity Installation Guide July 2018 ...