
46
Acme Packet 6100 Hardware Installation Guide
3.
Screw the two kep nuts onto the grounding post, securing the grounding
lug in place. When attached correctly, the grounding lug fits snugly
between the chassis’s rear panel and the kep nuts.
Figure 4 - 68. Kep Nuts Securing Grounding Cable to Grounding Terminals
4.
Connect the other end of the grounding wire to a suitable grounding point
at your site.
Caution
Always make the ground connection first and disconnect it
last when installing or removing the system from an
equipment rack.
AC Power Cord
Installation
This section shows you how to install an AC power cord.
Caution
Use a 15 Amp fused circuit for each AC power supply.
To install the AC power cords in the Acme Packet 6100:
1.
Set the System Power switch to the Stby position to cut off power to the
Acme Packet 6100
.
USB
Alarm
Console
System
Power
On
Stby
Stby
DIS
Figure 4 - 69. AC Power Supplies (left) and System Power Switch (right)
2.
Locate the two AC power cords shipped with your Acme Packet 6100.
Choose one power supply to work on first.
Содержание Acme Packet 6100
Страница 1: ...Acme Packet 6100 Hardware Installation Guide Regulatory Model AP6100 January 2014...
Страница 6: ...vi Acme Packet 6100 Hardware Installation Guide...
Страница 8: ...viii Acme Packet 6100 Hardware Installation Guide...
Страница 12: ...4 Acme Packet 6100 Hardware Installation Guide...
Страница 36: ...28 Acme Packet 6100 Hardware Installation Guide...
Страница 66: ...58 Acme Packet 6100 Hardware Installation Guide...
Страница 96: ...88 Acme Packet 6100 Hardware Installation Guide...
Страница 106: ...98 Acme Packet 6100 Hardware Installation Guide...