OptiPure OP175 Скачать руководство пользователя страница 9

OP175 System Installation, Operation & Maintenance 

9

 System Start-Up

Refer to the illustration in “Typical Installation” (page 

5).

IMPORTANT: 

 Before proceeding, position the 

Processor EMERGENCY BYPASS VALVE in the 

“SERVICE” position, assure that the Buffer Tank Valve 

is closed, and position the TANK INLET DIVERT 

VALVE to bypass the tank (Blue Valve Handle pointing 

up).

1.  Slowly open the user-supplied WATER SUPPLY 

VALVE and allow the filter housings to fill. Water 

will begin to flow from the end of the 1/4” black 

tubing routed to the drain. After some time, water 

will begin to flow from the gray hose which is 

temporarily routed to a bucket or the drain. Allow 

several minutes to flush the system until water 

flows smoothly from the gray hose and drain line. 

Check all of the plumbing connections and correct 

any leaks if necessary.

2.  The tank must be fill to start-up and purge the 

Repressurization Assembly. You can quickly fill the 

storage tank using the “System Bypass” on the 

processor. To do this use the following:

•  Route the 1/2” gray hose from the OPTIMIZED WATER 

OUTLET directly into the storage tank.

•  Turn the EMERGENCY BYPASS VALVE on the processor 

to “BYPASS.” This will allow feed water to bypass the 

processor and quickly fill the storage tank.

• 

When the tank fills to approximately 14 gallons return 

the processor EMERGENCY BYPASS VALVE to the 

“SERVICE” position.

 When the tank is full, the shutoff 

valve will close, stopping all flow.

•  With the tank full, ensure the valve at the top of the BUFFER 

TANK is in the OPEN position and that the 1/2” gray hose is 

still directed into the storage tank.

3.  Plug the power cord from the RP pump into the 

outlet. Water should begin to flow rapidly from the 

storage tank, through the RP assembly and back 

into the storage tank through the gray hose. Allow 

the pump to run for several minutes until all of the 

air is purged from the Repressurization Assembly. 

As the air is purged, the pump will run more 

smoothly and the water flow from the gray hose 

will become steady.

4.  Unplug the RP Pump cord.

 Connect to Equipment

You are almost ready to enjoy the benefits of 

Optimized Water. All that remains is to make the 

connection for distribution to your equipment.

1.  Remove the 1/2” gray hose from the storage tank 

and replace and tighten the lid to the storage tank.

2.  Complete the connection of the 1/2” gray hose 

 

from the Optimized Water Outlet on the Processor 

to the distribution line feeding the equipment that 

will be using the Optimized Water.

3.   Ensure that any valves or solenoid valves on the 

connected equipment are closed. Plug the RP 

pump back in. The pump will run and will fill the 

Buffer Tank until the pressure in the Buffer TAnk 

reaches 70 psi, and then the RP Pump will shut 

off.

4.  Open downstream valves at the equipment to 

allow air to purge from the distribution lines. When 

purging distribution lines 

do not allow the water 

level in the storage tank to drop below 1/4 full

Once purged and flushed, close the equipment 

valves. When there is no demand for water the 

pump will shut off automatically.

5.  Turn the TANK INLET DIVERT VALVE to the 

“TANK” position (blue valve handle pointing down).

Transition to Owner/Operator

The final step is to meet with the owner/operator, 

familarize them with the system and complete the post 

installation check list.

The system is now in “normal operating” mode and 

the storage tank will fill with Optimized Water from 

the processor. Complete the “Check List” to “Confirm 

Normal Operation and System Settings” (page 4 of the 

“Quick Installation Guide”) with the Owner/Operator.

Allow the tank to fill before beginning operation of the 

connected equipment.

1.  Push the purple “POWER” button on the Water 

Quality Monitor located on the upper left corner.  

It will immediately display the “IN” or Optimized 

Water TDS (Total Dissolved Solids) in PPM 

(parts per million). Document this number as the 

Optimized Water TDS.

2.  Within 30 seconds, push the “OUT” button to 

display the Membrane Permeate TDS and record 

this number as the Permeate TDS.  

 Complete the Installation

 Reading the TDS 

Содержание OP175

Страница 1: ...Installation Operation Maintenance Manual Rev 1 Manufactured By OptiPure Div of Procam Controls Inc 2605 Technology Drive Bldg 300 Plano TX 75074 P 972 881 9797 F 972 422 6262 OP175_manual_v1 indd 201...

Страница 2: ...gree II 7 Indoor use only protect from elements Explanation of Symbols The following symbols are used on the water processor The symbols and their explanation is given below Earth ground WARNING Hazar...

Страница 3: ...rating Pressure Gauge Membrane Reject Water Tubing Connection AMS QT15 Membrane Cartridge Reject Water Outlet 1 4 Push to Connect Connect to drain per local regulations 1 2 3 4 Optimized Water to Stor...

Страница 4: ...ted within 5 feet of the location of the unit Drain must allow a minimum flow of 2 gallons per minute Compliance with most local plumbing codes requires installation of an approved air gap in the drai...

Страница 5: ...Gauge Membrane Reject Water Tubing Connection AMS QT15 Membrane Cartridge Water Quality Monitor Optimized Water to Storage Tank Inlet on Valve Repressurization Assembly Outlet Hose Barb Repressur izat...

Страница 6: ...mp until completing the following section System Start Up Refer to Typical Installation diagram on page 5 and How to Use Our Quick Connect Fittings on page 16 when making the following connections A f...

Страница 7: ...nsions IMPORTANT ALLOW A MINIMUM OF 24 IN FRONT OF THE PROCESSOR FOR MAINTENANCE AND SERVICE DO NOT MOUNT SYSTEM ABOVE THE CEILING OR IN A LOCATION THAT IS NOT EASILY ACCESSIBLE WHEN THE 16 GAL TANK A...

Страница 8: ...e connection between the 1 2 hose and distribution line but for now leave the line loose and route the loose end of the gray hose into a drain or bucket make certain the hose length will reach the sto...

Страница 9: ...ump will run more smoothly and the water flow from the gray hose will become steady 4 Unplug the RP Pump cord Connect to Equipment You are almost ready to enjoy the benefits of Optimized Water All tha...

Страница 10: ...on to drain The pure water stream continues through the Permeate Check Valve 8 and through the Mineral Addition cartridge 2 then on to the tank through the Tank Inlet Divert Valve 11 on top of the St...

Страница 11: ...the ability to measure membrane production by closing the Buffer Tank Valve 17 and turning the Tank Inlet Divert Valve 11 to the bypass or UP position This diverts the permeate pure water produced by...

Страница 12: ...lve PN 524 20010 Pressure Gauge PN 530 20018 Reject Flow Control PN 564 02105 OUT Permeate Conductivity Probe Pressurized Water Check Valve PN 524 01035 Sample Port Valve PN 520 12223 Permeate Check V...

Страница 13: ...ge Tank PN 570 00016 Air Breather PN 300 40005 RP Pump PN 704 35513 Tank Bracket PN 594 80516 Buffer Tank PN 340 50001 Buffer Tank Valve PN 520 14501 Optimized Water Inlet Connect line from Optimized...

Страница 14: ...d pushing up then turn a quarter turn to the right 5 If it is necessary to replace the Mineral Addition Cartridge repeat steps 4 5 for the Mineral Addition Cartridge 6 Install a piece of 3 8 tubing in...

Страница 15: ...rt valve open the Sample Port and direct to a bucket or drain Turn the Tank Inlet Divert Valve to the Bypass or UP position Open the Water Supply Valve and put the Emergency Bypass Valve in the SERVIC...

Страница 16: ...Push tubing straight in Resistance will be felt when the tubing meets the O ring The outside of the tubing must be free of knicks and gouges Cut tubing with a plastic tubing cutter or a razor knife Ma...

Отзывы: