OptiPure OP175 Скачать руководство пользователя страница 15

OP175 System Installation, Operation & Maintenance 

15

 Routine Maintenance: AMS-QT15Change Procedure

The AMS-QT15 membrane is a high-efficiency, low-

fouling reverse osmosis membrane that will provide 

product water with 95+% rejection of the Feed Water.  

The life of the membrane will vary depending on Feed 

Water quality, usage, and Pre-Filter maintenance.  

Typical membrane life is 12 to 18 months, but with rou-

tine scheduled Pre-Filter replacement, and no adverse 

Feed Water conditions, the AMS-QT15 membrane 

may last 2-5 years.  

AMS-QT15 Replacement

1.  Either close the Water Supply Valve (shutting off 

all water flow), or put the Emergency Bypass Valve 

(on the Processor) in the System Bypass position 

(allowing untreated water to continue to flow to the 

equipment).  

2.  Place a bucket or other similar catch basin under 

the AMS-QT15.  Remove the black reject line from 

the push-to-connect elbow on the bottom of the 

membrane.  (Refer to “Push-to-Connect Fittings” 

on page 16.) Allow the membrane and reject line 

to drain into the bucket.

3.  Remove the AMS-QT15 cartridge from the head 

by turning the cartridge a quarter-turn to the left 

and pulling down on the cartridge.  

4.  With a wrench, remove the push-to-connect elbow 

and stem adapter attached to the bottom of the 

AMS-QT15 cartridge.  Remove the residual Teflon 

tape from the male 1/8” threads on the stem 

adapter.

5.  Wrap the 1/8” male thread on the stem adapter 

with 2 wraps of Teflon tape and re-install in the 

bottom of the new AMS-QT15 cartridge.

6.  Align the taps on the AMS-QT15 cartridge with 

the QT head and insert into the head and turn a 

quarter-turn to the right.  

7.  Insert the black reject line into the push-to-connect  

elbow on the bottom of the AMS-QT15 cartridge. 

8.  Install a piece of 3/8” tubing in the Processor 

Sample Port valve, open the Sample Port, and 

direct to a bucket or drain. Turn the Tank Inlet 

Divert Valve to the Bypass or UP position. Open 

the Water Supply Valve and put the Emergency 

Bypass Valve in the “SERVICE” position. Allow 

water to flush through the membrane displacing air 

and preservative to flow out the Sample/Flush port 

to drain for 5-10 minutes.

9.  Actuate the Water Quality Monitor and check the 

“OUT” or Permeate Water TDS.

10. After the AMS-QT15 cartridge is purged of air, 

close the Sample Port. 

11.  Check for leaks.

 Trouble-Shooting

Problem

Possible Cause

Resolution

Running out of water.

Operating Pressure reduced
Very cold Feed Water temperature 

Low Feed Water Pressure
Demand exceeds system capacity

Pre-Filters need to be replaced
Raise water temp to increase production or determine if higher capacity 

system is required
Install optional Feed Water Pressure Booster Pump
Determine if the demand is unusual or consistent or resize system

Poor water quality.

Membrane failure

Replace AMS-QT15 membrane

Short AMS-QT15 mem-

brane life.

Poor Feed Water quality, presence of 

iron, silica or non-calcium carbonate 

hardness

Determine Feed Water quality by obtaining a water quality report from city 

water supply utility or contact your OptiPure dealer

Short Pre-Filter life

Heavy sediment loading

Add FXAF01-12 or -12B for added Pre-Filter protection

Processor Does Not Shut 

Off or Turn On

Automatic Shutoff Valve not function-

ing

Replace Automatic Shutoff Valve

Water Quality Monitor will 

not turn on

Dead batteries

Replace batteries by sliding Water Quality Monitor up and removing the six 

screws on the back cover. Remove cover to access battteries.

RP Pump runs intermit-

tently or rough.

Air trapped in pump head.
Downstream water leak.

Unplug pump and open downstream valve to empty Buffer Tank.
Repair or eliminate downstream water leak.

RP Pump cycles on-off 

frequently

Low air pre-charge in Buffer Tank

Empty Buffer Tank and re-charge air pressure to 20 psi.

Содержание OP175

Страница 1: ...Installation Operation Maintenance Manual Rev 1 Manufactured By OptiPure Div of Procam Controls Inc 2605 Technology Drive Bldg 300 Plano TX 75074 P 972 881 9797 F 972 422 6262 OP175_manual_v1 indd 201...

Страница 2: ...gree II 7 Indoor use only protect from elements Explanation of Symbols The following symbols are used on the water processor The symbols and their explanation is given below Earth ground WARNING Hazar...

Страница 3: ...rating Pressure Gauge Membrane Reject Water Tubing Connection AMS QT15 Membrane Cartridge Reject Water Outlet 1 4 Push to Connect Connect to drain per local regulations 1 2 3 4 Optimized Water to Stor...

Страница 4: ...ted within 5 feet of the location of the unit Drain must allow a minimum flow of 2 gallons per minute Compliance with most local plumbing codes requires installation of an approved air gap in the drai...

Страница 5: ...Gauge Membrane Reject Water Tubing Connection AMS QT15 Membrane Cartridge Water Quality Monitor Optimized Water to Storage Tank Inlet on Valve Repressurization Assembly Outlet Hose Barb Repressur izat...

Страница 6: ...mp until completing the following section System Start Up Refer to Typical Installation diagram on page 5 and How to Use Our Quick Connect Fittings on page 16 when making the following connections A f...

Страница 7: ...nsions IMPORTANT ALLOW A MINIMUM OF 24 IN FRONT OF THE PROCESSOR FOR MAINTENANCE AND SERVICE DO NOT MOUNT SYSTEM ABOVE THE CEILING OR IN A LOCATION THAT IS NOT EASILY ACCESSIBLE WHEN THE 16 GAL TANK A...

Страница 8: ...e connection between the 1 2 hose and distribution line but for now leave the line loose and route the loose end of the gray hose into a drain or bucket make certain the hose length will reach the sto...

Страница 9: ...ump will run more smoothly and the water flow from the gray hose will become steady 4 Unplug the RP Pump cord Connect to Equipment You are almost ready to enjoy the benefits of Optimized Water All tha...

Страница 10: ...on to drain The pure water stream continues through the Permeate Check Valve 8 and through the Mineral Addition cartridge 2 then on to the tank through the Tank Inlet Divert Valve 11 on top of the St...

Страница 11: ...the ability to measure membrane production by closing the Buffer Tank Valve 17 and turning the Tank Inlet Divert Valve 11 to the bypass or UP position This diverts the permeate pure water produced by...

Страница 12: ...lve PN 524 20010 Pressure Gauge PN 530 20018 Reject Flow Control PN 564 02105 OUT Permeate Conductivity Probe Pressurized Water Check Valve PN 524 01035 Sample Port Valve PN 520 12223 Permeate Check V...

Страница 13: ...ge Tank PN 570 00016 Air Breather PN 300 40005 RP Pump PN 704 35513 Tank Bracket PN 594 80516 Buffer Tank PN 340 50001 Buffer Tank Valve PN 520 14501 Optimized Water Inlet Connect line from Optimized...

Страница 14: ...d pushing up then turn a quarter turn to the right 5 If it is necessary to replace the Mineral Addition Cartridge repeat steps 4 5 for the Mineral Addition Cartridge 6 Install a piece of 3 8 tubing in...

Страница 15: ...rt valve open the Sample Port and direct to a bucket or drain Turn the Tank Inlet Divert Valve to the Bypass or UP position Open the Water Supply Valve and put the Emergency Bypass Valve in the SERVIC...

Страница 16: ...Push tubing straight in Resistance will be felt when the tubing meets the O ring The outside of the tubing must be free of knicks and gouges Cut tubing with a plastic tubing cutter or a razor knife Ma...

Отзывы: