OptiPure BWS1500 Скачать руководство пользователя страница 9

BWS1500 System Installation, Operation & Maintenance 

9

 Wall Mounting

Before beginning installation of the system, remove the 

plastic cover from the BWS1500 processor. Replace 

cover at the end when installation and adjustments are 

complete.

The processor should always be mounted where it is well-

supported, either using anchors in a cement wall, or using 

the support of studs in a wall-board wall. 

Never mount it 

directly to sheet-rock alone.

 Instead, mount it on a sheet 

of plywood which is anchored to the wall studs, as shown 

above.
Four user-supplied bolts or screws with a head diameter 

between 3/8” and 1/2” (which will fit into the keyholes in the 

system bracket, but will not slip out when tightened) should 

be used to hang the system. 

This will allow the unit to be 

lifted off the bolts, if necessary for maintenance, without 

removing all the bolts from the wall. 
Mark the mounting screw locations with dimensions as 

shown above.  BE SURE TO ALLOW 3” BELOW THE 

CARTRIDGES TO ALLOW FOR REMOVAL.  Screw the 

four bolts or screws in place, leaving approximately 1/4” 

clearance between the bottom of each screw head and the 

wall. Position the system over the mounting screws, and let 

the bracket slip down into the keyholes. Tighten the screws. 

Tighten all screws.

 System Installation

Note: Do not plug in the power cord from the RP pump 

until completing the section “System Start-Up”.
Refer to “Typical Installation” diagram on pages 7 & 8, 

and “How to Use Our Quick-Connect Fittings” on the 

last page of this manual, when making the following 

connections.

A feed water ball valve and pressure gauge (user supplied) 

should be installed to provide water to the system FEED 

WATER INLET with the 1/2” gray hose (supplied). Hose, 

tubing and fittings for making connections between the 

processor, storage tank and drain are supplied in the 

installation kit. Hose and tubing will need to be cut to 

appropriate lengths.

1.   Remove the tank lid. Inside the tank, the float 

valve may be secured for shipping. Remove any 

wrapping on the float to allow it to hang and move 

freely.

2.   DRAIN: Connect the 3/8” black tubing from the 

installation kit to the REJECT WATER OUTLET on 

the processor. Run the line to an appropriate drain. 

Observe local plumbing codes and supply an 

appropriate air gap. (Any fittings for connecting to 

the drain will need to be supplied by the customer.) 

Fix tubing in place at the drain.

3.   FEED WATER: Apply 3 wraps of Teflon tape to the 

1/2” FPT x 1/2” push-connect fitting (supplied). 

Screw the fitting into the Feed Water Supply Ball 

Valve and tighten (DO NOT OVERTIGHTEN). 

Insert one of the supplied 1/2” Hose Insert x 1/2” 

Tube Stem fittings into the 1/2” gray hose and 

secure it with a hose clamp. (See “Hose Fitting 

Assembly” photo.) Insert this fitting into the push-

connect fitting at the Feed Water Supply. Route 

the hose to the Processor and cut to appropriate 

length. Using another Hose Insert x Tube Stem 

fitting, connect the other end of the hose to the 

FEED WATER INLET located on the Bypass Valve 

on the left side of the Processor.

4.  PROCESSOR TO TANK: Connect a piece of the 

3/8” blue tubing to the OPTIMIZED WATER OUTLET 

fitting on the Processor.  Connect the other end of this 

tubing to the OPTIMIZED WATER INLET on the INLET 

DIVERT VALVE (see photo) at the top of the Storage 

Tank.

NOTE: When cutting the tubing, use a sharp tubing 

cutter or blade and make a clean, straight cut before 

inserting into a push-connect fitting. When routing 

tubing, do not make sharp bends or crimp the tubing.

5.  TANK/RP PUMP - 

175 Gallon Storage Tank Only

Place the pump near the storage tank, on the floor or  

on a stand no more than 6” above the bottom of the 

tank, with the pump inlet towards the tank. Using the 

supplied 1” hose and large hose clamps, connect the 

tank outlet hose barb to the pump inlet hose barb.

6.  TANK/RP PUMP TO PROCESSOR: Using two of the 

1/2” hose barb inserts (supplied), a piece of 1/2” gray 

hose, and two hose clamps, connect hose from the 

REPRESSURIZATION ASSEMBLY OUTLET on the 

50 Gallon Repressurization Assembly

 - for the 

175 

Gallon Tank

, the push-connect fitting in the tee on top 

of the RP Pump - to the STORAGE TANK/RP RETURN 

LINE connection on the Processor. 

7.  HIGH LEVEL SWITCH CABLE: Route the cable coming 

from the high level switch through the hole in the rear 

Hose Fitting Assembly

Plywood anchored to wall

15”

27.75”

26.5”

Outside edge of 

processor bracket

11”

Содержание BWS1500

Страница 1: ...allation Operation Maintenance Manual Rev 2 1 Manufactured By OptiPure Div of Procam Controls Inc 2605 Technology Drive Bldg 300 Plano TX 75074 P 972 881 9797 F 972 422 6262 BWS1500 iom manual_v2 1 in...

Страница 2: ...RNING Hazardous Voltage Safety Instructions 1 Please read and follow these instructions when connecting and using the system 2 To avoid electrical shock never touch the inside of the electrical box On...

Страница 3: ...r to Untreated Water when needed by turn ing handle horizontal Optimized Water Outlet 3 8 Push To Connect Connect to Optimized Water Storage Tank Inlet Reject Water Outlet 1 4 Push to Connect Connect...

Страница 4: ...Buffer Tank Pre charged air bladder 20 psi 175 Gallon Optimized Water Storage Tank with Separate RP Pump 50 Gallon Optimized Water Storage Tank RP Pump Assembly Buffer Tank Valve Shown in normal posit...

Страница 5: ...requires installation of an approved air gap in the drain line The drain connection should be accessible for system set up and service Electrical requirements A power source with two outlets should b...

Страница 6: ...N FRONT OF THE PROCESSOR FOR MAINTENANCE AND SERVICE DO NOT MOUNT SYSTEM ABOVE THE CEILING OR IN A LOCATION THAT IS NOT EASILY ACCESSIBLE WHEN THE 50 GAL TANK ASSEMBLY IS FULL OF OPTIMIZED WATER IT WI...

Страница 7: ...2 3 Processor Optimized Water Storage Tank 50 gal Atmospheric Storage Tank RP Return Optimized Water Outlet Sample Port Pressurized Water Line 1 2 Gray Hose with hose barb inserts at both ends from Re...

Страница 8: ...ssor Optimized Water Storage Tank 175 gal Atmospheric Storage Tank RP Return Optimized Water Outlet Sample Port Pressurized Water Line 1 2 Gray Hose with hose barb inserts at both ends from Repressuri...

Страница 9: ...bing from the installation kit to the REJECT WATER OUTLET on the processor Run the line to an appropriate drain Observe local plumbing codes and supply an appropriate air gap Any fittings for connecti...

Страница 10: ...n the 1 2 hose and the distribution line which will be completed in Connect to Equipment NOTE If Post Filtration is used it will be installed between the Optimized Water Outlet and the designated equi...

Страница 11: ...firmly grip the gray hose 4 Plug the power cord from the RP pump into the outlet For a 175 Gallon Tank turn on the RP Pump button on top of pump Water should begin to flow rapidly from the Storage Ta...

Страница 12: ...to the System Bypass position When normal operation is restored toggle the Bypass Switch plug in turn on the RP Pump and turn the Bypass Valve to the Service position What are all those parts and what...

Страница 13: ...2 to the SYSTEM BYPASS position The Bypass Switch on the Controller must also be placed in the System Disable position This allows tap water to bypass the processor and RP assembly A Sample Port 21 al...

Страница 14: ...a 175 Gallon Storage Tank is a demand controlled pump that maintains pressure down stream at all times It shuts off automatically when there is no demand for water As long as the Pump is placed at a...

Страница 15: ...ty Probe Pressurized Water Check Valve PN 524 01035 Sample Port Valve PN 520 12223 Permeate Check Valve PN 524 01030 Water Quality Monitor PN 530 40112 IN Optimized Water Conductivity Probe CTO Q PreF...

Страница 16: ...ssor When tank is full float switch is in up positon and switch inside float is open causing Processor to shut off RP Pump PN 704 35513 Tank Bracket PN 594 80510 Buffer Tank PN 340 50004 Buffer Tank V...

Страница 17: ...tem turn Divert Valve handle so the arrow points up towards the Sample Port Float Valve inside tank PN 520 01203 Air Breather PN 300 40005 High Level Float Switch inside tank PN 740 01120 Controls Pro...

Страница 18: ...he water temperature will not later go up without a corresponding adjustment being made to the operating pressure The maximum safe permeate flow rate is 1200 gpd 50 gph 0 83 gpm 4500 liters per day 19...

Страница 19: ...osition and with a 50 Gallon Tank Repressurization Assembly close the Sample Port and open the Buffer Tank Valve Measuring Reject Flow Rate Access the Reject Drain Line and measure the flow in a simi...

Страница 20: ...equipment such as during filter changes Problem Conditions 1 Low Inlet Pressure Fault If the pressure at the pump inlet drops below 10 psi the pump will automatically turn off and the Low Pressure LED...

Страница 21: ...Tank Inlet Divert Valve to the Normal position handle horizontal or down If using a 50 Gallon Tank RP Assy close the Sample Port on the Processor 10 Check for leaks 11 Plug in the RP Pump power cord...

Страница 22: ...indicator on Controller Replace High Level Float Switch Processor Does Not Turn On See also Processor Either Does Not Shut Off or Turn On above Controller Bypass Switch left in OFF position LED will...

Страница 23: ...f Error on RP Pump Ensure power cord is plugged into outlet with power check circuit breaker Press switch on top of RP Pump to turn it On Check the top of the RP Pump for errors contact OptiPure to re...

Страница 24: ...e felt when the tubing meets the O ring The outside of the tubing must be free of knicks and gouges Cut tubing with a plastic tubing cutter or a razor knife Make a clean square cut After cutting make...

Отзывы: