Delivery, interdepartmental transport, unpacking
Version 1.0.1 dated 2017-11-16
Page 27
Translation of the original instructions
TX6222
GB
T
X
6222
_GB
_3.
fm
OPTIMUM
M A S C H I N E N - G E R M A N Y
®
3.5.3
Installation plan
Img. 3-3:
3.6
Assembly and installation, initial operation
WARNING!
The machine may only be commissioned after proper installation.
There is a danger to persons and equipment, if the first commissioning carried out by
inexperienced personnel. We do not assume any liability for damages caused by
incorrectly performed commissioning.
The machine can be placed in three different ways.
Anchor-free assembly,
with vibration dampers,
anchored assembly.
ATTENTION!
Insufficient rigidity of the ground leads to superposition of vibrations between the lathe
and the ground (natural frequency of the components). Critical speeds with unpleasant
vibrations are rapidly achieved if the rigidity of the whole system is insufficient; this will
lead to bad turning results.
3.6.1
Anchor-free assembly
This must be done by laying down a strong base on each support of the levelling points,
between the foundation and the machine foot.
868
58
0
173
9
177
475
2585
369
1739
69
1905
3605
moved out
Coolant tank
Electrical connection
Main switch
DPA