Delivery, interdepartmental transport, unpacking
Version 1.0.1 dated 2017-11-16
Page 24
Translation of the original instructions
TX6222
GB
T
X
6222
_GB
_3.
fm
OPTIMUM
M A S C H I N E N - G E R M A N Y
®
3.3
Unpacking
Install the machine close to its final position before unpacking. If the packaging shows signs of
having possibly been damaged during transport, take the appropriate precautions to prevent
the machine being damaged when unpacking. If damage is discovered, the carrier and/or ship-
per must be notified immediately so the necessary steps can be taken to register a complaint.
Inspect the machine completely and carefully, making sure that all materials, such as shipping
documents, manuals and accessories supplied with the machine have been received.
Dismantle the cover and side parts of the box.
Disassemble the clamping bolts which are used to fix the machine on the pallet.
3.4
Lifting the machine
3.4.1
Forklift
Put 2 wooden beams on the forks.
Lift the lathe from the rear site with the forklift on machine bed.
Img. 3-1:
Forklift transportation method
The machine can be lifted underneath
the machine substructure using a forklift
truck.
5 t
5 t