OPTICAL SYSTEMS DESIGN
DOC ID: 10118101
OSD2512 OPERATOR MANUAL
PAGE 13
3.4
FITTING SFP CONNECTORS
Care should be taken when inserting/removing the SFP connectors from the SFP port as SFP modules
are Electrostatic (ES) sensitive and Electrostatic Discharge (ESD) precautions should be taken when
installing. Ensure that the SFP is fully engaged and latched into position.
Inserting SFP
– Ensure that the SFP lever is in the locked position and insert into appropriate SFP
port. Gently push the SFP until it locks into place. Remove plastic/rubber dust cap and fit appropriate
fiber cable.
Removing SFP
– Remove fiber connector. Pull the SFP lever down to unlock SFP from housing.
Using the lever, gently pull the SFP out.
Fiber SFP
FIGURE 4: FITTING/REMOVING SFP CONNECTORS
Inserting
SFP
Removing
SFP
1
2
Содержание OSD2512
Страница 1: ...User Manual OSD2512 MANAGED 12 x 10 100 1000BASE T RJ45 AND 2 x 1G SFP ETHERNET SWITCH...
Страница 2: ......
Страница 26: ...OPTICAL SYSTEMS DESIGN DOC ID 10118101 OSD2512 OPERATOR MANUAL PAGE 26 4 3 OSD2512 DIMENSIONS 442mm 200mm 44mm...
Страница 164: ...OPTICAL SYSTEMS DESIGN DOC ID 10118101 OSD2512 OPERATOR MANUAL PAGE 164 LLDP MED CONFIGURATION Configuration LLDP MED...
Страница 252: ...OPTICAL SYSTEMS DESIGN DOC ID 10118101 OSD2512 OPERATOR MANUAL PAGE 252 SFLOW CONFIGURATION Configuration sFlow...
Страница 399: ...OPTICAL SYSTEMS DESIGN DOC ID 10118101 OSD2512 OPERATOR MANUAL PAGE 399...
Страница 400: ...OPTICAL SYSTEMS DESIGN DOC ID 10118101 OSD2512 OPERATOR MANUAL PAGE 400...