DS-E Series
(
1~6KVA
)
User’s Manual
16
Socket output to load
Commercial power input
DC input
(36VDC)
For long time-delay
UPS, connect to
commercial power
first, then to battery
expansion line.
!
Socket output to load
Socket output to load
Commercial
power socket
AC INPUT
FUSE
RS232
AC
OUTPUT
DC INPUT
Fig. 3-2 DS1000E Series connection Schematic
The AC input and output of DS1000E series only adopt the socket. Please
insert the power input wire in the commercial power socket directly, and insert
the load power cord into the output socket.
For long time-delay UPS, battery input expansion line is required to be
connected. That is, insert the battery connection wire six-core plug of the
battery box into the six-core socket on main unit rear panel. Refer to the
relevant content of the battery box installation and cable connection.
3.5.2 DS2000E Series
AC input of DS2000E series adopts line bank, and the AC output adopts socket
and line bank. You can insert load power cord into the output socket directly.
Normally, the load current of each socket cannot exceed 5A.
When connecting the line bank, take the small cover board off from the line
bank, and pay attention to the definition of connection terminal: from the left to
the right (rear view) orderly are: live wire (L), neutral wire (N) and ground wire
(GND). After the connection, please check up whether the wire of connection is
correct and firm, and then install the small cover board back to the box.