3.2 Procedures of Dismantling Cases
When installing the equipment, the packing should be removed after carrying
the equipment to the installation site. The packing of UPS equipment and
fittings (battery, etc.) should be wooden case and carton. Check the UPS
equipment and fittings against the shipping list.
If the equipment or fittings are damaged during transportation or the equipment
and fittings are not accord with the ordering contract, make site record in time
and immediately contact the local office or distributors.
3.3 Installation of UPS
Because the main unit size of DS-E Series standard time-delay model and long
time-delay model is small, the UPS can be placed on the flat surface directly
without other fixing or installation. For convenient operation, maintenance and
heat emission of the equipment, there shall be at least 30cm~50cm room
space reserved around the machine frame and 50cm above the upper machine
frame. The vent fan shall be installed beside the battery. Keep good interior
ventilation. The service life of the battery is the longest when the battery is
used under normal temperature (20
℃
). Recommend to install air-conditioning
equipment in equipment rooms with allowed conditions. Refer to Fig. 3-1 for
the precautions of UPS installation and use.
Fig. 3-1 Precautions of UPS Installation and Use