Optec, Inc.
199 Smith Street ∙ Lowell, Michigan 49331 ∙ U.S.A.
www.optecinc.com
Page
27
of
29
Revision 10 –8/31/2012
3.
Plug the short HV cable with the RED 4-position connector into the HV power
supply socket on the same side as the line cord receptacle. Next, plug the other
end of this short HV cable into either of the 2-position sockets on the Alnitak XL
controller box.
4.
Plug the 10-foot gray Lamp cable's white 2-position plug into the remaining 2-
position socket on Alnitak XL controller box. Connect the round black connector
into the panel receptacle. Align the white dot on the round plug with the dot on
the panel receptacle. Gently push the plug on and rotate the plug shell ¼-turn
until you feel it click. Reverse this procedure to remove.
Do not twist the
connector by more than ¼-turn
. Be careful not to impact or bend the connector
while mated.
5.
Connect the USB cable between the Flat-Man XL controller box and the
computer or a self-powered USB hub.
6.
Use the supplied IEC wall power cord (or replace with any IEC cord suitable to
the local wall plug configuration) into the AC mains wall socket.
NOTE
: the
Cevanna HV Power Supply for the XL30 and larger lamp panels does NOT
include an ON/OFF switch. For remote installations a web-switch is highly
recommended for remote control of the inverter power. Alternatively, a common
switched power strip can be used for ON/OFF capability.