34
Openreach: Developer Guide
Furniture
Cable brackets and steps (where
required) are supplied in a bagged kit
and easily slot into purpose designed
pockets in the chamber. The brackets
and steps drop into preformed slots.
Available Size Range
Product Code
Clear opening
Depth Per
Section
JMF104
915X445mm
150mm
JMF106
1310X610mm
150mm
Duct entries
Duct entries can be cut as and where required
using a hole saw mounted on a cordless drill.
The chambers incorporate guides which identify
drilling points to ensure correct duct spacing.
A maximum of 4 duct entries can be made into
a single wall of the Quadbox™.
Quadbox points of note
As with brick built chambers, care should be taken to make sure:
• The box is set at the correct depth and the base/ plinth is installed correctly.
• The side wall is not damaged/misshapen due to over compaction.
• The frame is level with the surface and a core drill is used for cutting duct entries.
• The developer is required to purchase the required wall bearers
Modular jointing chambers – Quadbox
TM
Содержание ONT
Страница 1: ...fibre network Developer Guide Version 7 1 August 2018 How to build a ...
Страница 21: ...21 Multi Dwelling Units MDUs Maisonettes How to build a fibre network version 7 1 ...
Страница 22: ...22 Openreach Developer Guide Multi Dwelling Units MDUs Flat over garage ...
Страница 23: ...23 Multi Dwelling Units MDUs Chalets How to build a fibre network version 7 1 ...
Страница 24: ...24 Openreach Developer Guide Multi Dwelling Units MDUs Modular Passive homes ...
Страница 27: ...27 Commercial units SME within an MDU How to build a fibre network version 7 1 ...
Страница 28: ...28 Openreach Developer Guide Commercial units Commercial unit within a commercial only site ...
Страница 50: ...50 Openreach Developer Guide Notes ...
Страница 51: ...fibre network How to build a ...