![ontrac Multitrac MME Series Скачать руководство пользователя страница 54](http://html1.mh-extra.com/html/ontrac/multitrac-mme-series/multitrac-mme-series_operation-instructions-manual_1638642054.webp)
ACK21-01A
ontracactuators.com
49
7.4.4 Wiring Installation of Channel Expansion Board
:
7.4.5 Wiring Installation of Electric Motor
:
1. Remove the four fixing
bolts circled in the figure.
2. Remove the fixed column
circled in the figure after
removing the electronic unit
cover. Cut off the tie securing
the internal wiring. Pull out
the three signal plugs at the
bottom in the figure above.
3. Unscrew the fixing screws
circled in the figure and pull up
the main control board (circuit
board with LCD in the figure)
4. After removing the yellow circuit board
(387/385 channel expansion board) in
the figure, remove the cable fixing
card circled in the figure to remove the
387/385. Please reverse the assembly
process according to the disassembly
process.
387 channel
expansion board
385 channel
expansion board
1. Open the electronic unit cover
and remove the motor screws
2. Pull out the three lines WS
GN RT in the figure and record
the color
3. Pull out the plug in the middle
of the figure
4. Remove the motor
5. Thread the traction wire out
according to figure 4 and
figure 5
6. Tie the wire on the motor and pull it
out as shown in Fig. 5 and Fig. 6
7. Restore the plug as shown in Fig.2
and Fig.3
8. Install the motor and electronic unit
cover