
42
S
ect
io
n
3
Communic
a
tion
s
Te
s
t
Heat-resistive RFID System
User's Manual
Section 3
Before Communications
Communications Test
Check Items
Check the following items before the trial operation of the whole system.
Procedure for Trial Operation
No.
Items
Details
Page
1
Power supply and
I/O line connections
•
Are the power supply and I/O lines properly wired?
•
Are all the terminal screws tightened securely?
2
DIP switch settings
•
Is the node number set correctly?
•
Are the communications specifications set correctly?
3
Antenna connection
Is the Antenna connected properly?
4
Host device connection
Is the RS-232C/RS-485 connector connected properly?
5
Antenna and Tag connection
Are the Antenna and Tag located properly?
Turn power ON
Online test with
the host device
Completion
Trial operation of
the system
•
Check that the supply voltage and the connection of power supply
terminals are correct.
•
Check that the RUN indicator of the Controller and the POWER
indicator of the Antenna are ON.
Check the communications between the host device and Controller
with test commands.
Check the operation of the whole system with actual commands
executed.
Содержание V680-CA1D
Страница 18: ...16 Section 1 Operation Flowchart Heat resistive RFID System User s Manual Section 1 Product Overview MEMO ...
Страница 46: ...44 Section 3 Communications Test Heat resistive RFID System User s Manual Section 3 Before Communications MEMO ...
Страница 112: ...110 Heat resistive RFID System User s Manual ...