![Omron V400-R2 Series Скачать руководство пользователя страница 27](http://html.mh-extra.com/html/omron/v400-r2-series/v400-r2-series_connection-manual_741434027.webp)
7. Connection Procedure
24
10
The Synchronization Dialog Box
is displayed.
Confirm that the data to transfer
(NJ501 in the right dialog) is
selected. Then, click the
Transfer To Controller
Button.
*After executing the Transfer To
Controller, the Sysmac Studio
project data is transferred to the
Controller and the data are
compared.
11
A confirmation dialog box is
displayed. Confirm that there is
no problem and click the
Yes
Button.
A screen stating "Synchronizing"
is displayed.
A confirmation dialog box is
displayed. Confirm that there is
no problem and click the
No
Button.
*Click the
No
Button to operate
in PROGRAM mode in the
following steps.
12
Confirm that the synchronized
data is displayed with the color
specified by "Synchronized",
and that a message is displayed
stating "The synchronization
process successfully finished"
If there is no problem, click the
Close
Button.
*A message stating "The
synchronization process
successfully finished" is
displayed if the Sysmac Studio
project data if the data in the
Controller match.
*If the synchronization fails,
check the wiring and repeat the
procedure in this section.
Содержание V400-R2 Series
Страница 57: ...9 Program 54 3 PMCR communications processing ...
Страница 58: ...9 Program 55 4 Processing number error process ...