![background image](http://html.mh-extra.com/html/omron/profibus-dp-gateway/profibus-dp-gateway_operation-manual_742999030.webp)
15
Basic Operating Procedure
Section 1-4
1-4-2
Procedures Prior to Starting Communications
Use the following procedure to configure the Unit using CX-Profibus:
1,2,3...
1.
Wire the network, to connect the PRT1-SCU11 to the RS-422A / RS-485
devices.
2.
Turn ON the PLC power supply and the power supply of the PRT1-SCU11.
3.
In CX-Profibus, create a network and define the parameters and I/O con-
figurations for the PRT1-SCU11 settings and the allocated modules. De-
termine the baud rate and the bus parameter setup,
see section
2-6
Configuring the PROFIBUS DP network
.
4.
Download the network configuration to the PROFIBUS DP master. After
downloading the configuration, CX-Profibus will restart the PROFIBUS DP
master automatically.
5.
After restarting the PRT1-SCU11 it will automatically start communication.
Содержание PROFIBUS DP GATEWAY
Страница 1: ...OPERATION MANUAL PROFIBUS DP Gateway to Host Link Compoway F PRT1 SCU11 Cat No W01E EN 02 ...
Страница 2: ...PRT1 SCU11 PROFIBUS DP Gateway Operation Manual Revised September 19 2005 ...
Страница 3: ...iv ...
Страница 15: ......
Страница 31: ......
Страница 71: ......
Страница 77: ......
Страница 81: ......