32
Switching Screens from CP1E
Switch the NV screen from the CP1E PLC by using its system memory.
Creating a new screen in an existing project
Add a base screen to an existing project. The screen is used to confirm the screen
switching operation.
1. Start the NV-Designer, and open a project.
Double-click “1” in the Screen Manager. Base screen 1 will open.
Double-click!!
2. Create a character string, and enter “Base scr. 1”. Place it at the center of the screen.
Transfer the screen data to the NV.
Base screen 1
Содержание NV3Q-MR21
Страница 36: ...2015 0715 0110 V411 E1 02...