5-3 Special Screen
5-9
5-3-4 Communication
Test
This function is used to check whether communications with a specified destination are
possible or not, by sending and receiving FINS messages.
Display the Communication Test Screen by using operations in the System Menu as follows.
1. Click the
Display
Button next to the Communication Test to display the Communication
Test Screen.
2. Set each of the setting items as follows:
No Item
Function
1
Send To
Selects the host of the transmission destination from the list of hosts
that are registered in the project.
2
Send Message
Sets the FINS command being to be sent.
3
No. of Sends
Displays the number of times messages are transmitted. The number
of times is fixed to 1.
4
Time-out Period
Displays the timeout time for when the communication method is set
to the Ethernet or Controller Link. (Fixed to 3,000ms)
An error message will be displays when the timeout time is exceeded
after transmitting the FINS commend.
For serial communications, the timeout time set with the
Initialization/Setting in the System Menu is used.
3. Click the
Send
Button to start transmission.
The sending indicator will remain lit until the transmission is completed.
After transmission, the Receive indicator will remain lit until reception is completed.
4. If communications are performed normally, a response will be received from the
transmission destination and the following items will be displayed. For details on FINS
commands and information displayed in comments, refer to the FINS Commands
Reference Manual (W227).
1
2
3
4
5
6
7
Содержание NS-RUNTIME - SOFTWARE
Страница 1: ...NS Runtime Software USER S MANUAL Cat No V093 E1 04...
Страница 2: ......
Страница 28: ...1 4 Comparison between the NS Series and the NS Runtime 1 14...
Страница 38: ...2 6 User Interface 2 10...
Страница 56: ...3 5 Converting Projects 3 18...
Страница 84: ...4 5 Macros 4 28...
Страница 136: ...5 11 Window Size 5 52...
Страница 154: ...7 3 Error Messages and Countermeasures 7 6...
Страница 156: ......
Страница 157: ......