background image

10. Appendix 2 Setting the Tag Data Links Using the Software 

 62

10 

The device parameters are 

uploaded. When uploading is 

completed, the dialog box on the 

right is displayed.   

Check the contents and click the 

OK 

Button. 

 

11 

After uploading is completed, 

confirm that the Network 

Configuration Pane shows the 

updated IP addresses of the 

devices.  

IP address of node 1: 

192.168.250.1 

IP address of node 2: 

192.168.250.2 

 

 

Содержание NJ-series

Страница 1: ...Machine Automation Controller NJ series EtherNet IPT M Connection Guide OMRON Corporation CJ2 series Controller P568 E1 01 ...

Страница 2: ... countries ODVA and EtherNet IPTM are trademarks of ODVA EtherCAT is registered trademark and patented technology licensed by Beckhoff Automation GmbH Germany Sysmac is a trademark or registered trademark of OMRON Corporation in Japan and other countries for OMRON factory automation products Company names and product names in this document are the trademarks or registered trademarks of their respe...

Страница 3: ... 5 Checking the EtherNet IP Communications 32 8 Initialization Method 38 8 1 Initializing the Controller 38 8 2 Initializing the PLC 41 9 Appendix 1 Detailed Settings of the Tag Data Links 43 9 1 Global Variable Table 43 9 2 Relationship between Destination Device and Global Variables 43 9 3 Associating the Tag Data Links 44 10 Appendix 2 Setting the Tag Data Links Using the Software 45 10 1 Overv...

Страница 4: ...No Model Manual name W500 NJ501 NJ301 NJ series CPU Unit Hardware User s Manual W501 NJ501 NJ301 NJ series CPU Unit Software User s Manual W506 NJ501 NJ301 NJ series CPU Unit Built in EtherNet IPTM Port User s Manual W504 SYSMAC SE2 Sysmac Studio Version 1 Operation Manual W472 CJ2H CPU6 EIP CJ2M CPU3 CJ series CJ2 CPU Unit Hardware User s Manual W473 CJ2H CPU6 EIP CJ2M CPU3 CJ series CJ2 CPU Unit...

Страница 5: ...two or more tags for the data exchange is called a tag set Up to eight tags can be configured per tag set for OMRON controllers Tag data link In the EtherNet IP the tag and tag set can be exchanged cyclically between nodes without using the user program This standard feature on the EtherNet IP is called a tag data link Connection A connection is used to exchange data as a unit within which data co...

Страница 6: ...part or the whole of this document without the permission of OMRON Corporation 5 The information contained in this document is current as of September 2013 It is subject to change without notice for improvement The following notation is used in this document Indicates a potentially hazardous situation which if not avoided will result in minor or moderate injury or may result in serious injury or d...

Страница 7: ...s prepared beforehand hereinafter referred to as the procedure for using the configuration files Section 9 A 1 and Section 10 A 2 describe the procedures for setting parameters with software without using files hereinafter referred to as the procedure for setting parameters from beginning To follow the procedure for using configuration files obtain the latest Sysmac Studio project file and Network...

Страница 8: ... connecting devices and checking the connection You cannot use devices with versions lower than the versions listed in Section 5 2 To use the above devices with versions not listed in Section 5 2 or versions higher than those listed in Section 5 2 check the differences in the specifications by referring to the manuals before operating the devices Additional Information This document describes the ...

Страница 9: ...ile OMRON_CJ2_EIP_EV101 smc Ver 1 01 OMRON Network Configurator v3 network configuration file OMRON_CJ2_EIP_EV101 nvf Ver 1 01 Personal computer OS Windows7 USB cable USB 2 0 type B connector LAN cable STP shielded twisted pair cable of Ethernet category 5 or higher OMRON PLC CPU Unit Built in EtherNet IP port CJ2M CPU32 Built in CJ2M EIP21 Ver 2 0 Ver 2 1 OMRON Power Supply Unit CJ1W PA202 OMRON ...

Страница 10: ...that case use the equivalent procedures described in the Sysmac Studio Version 1 Operation Manual Cat No W504 Network Configurator Online Help and CX Programmer Operation Manual Cat No W466 Additional Information The system configuration in this document uses USB for the connection to the Controller For information on how to install a USB driver refer to A 1 Driver Installation for Direct USB Cabl...

Страница 11: ...al variables of the Controller The relationship between the device data and the global variables is shown below The following global variables are defined in the Configuration file Output area Controller PLC Offset Destination device data Global variable Data type Retained 0 to 9 PLC D10100 onwards 20byte EIP002_D10100_OUT WORD 10 Retained Input area Controller PLC Offset Destination device data G...

Страница 12: ...tting Overview The following figure shows the relationship between the processes to operate the EtherNet IP tag data link using the procedure for using configuration files Precautions for Correct Use Prepare the latest Sysmac Studio project file and Network Configurator v3 network configuration file from OMRON in advance To obtain the files contact your OMRON representative Transferring the projec...

Страница 13: ...e Sysmac Studio project file 7 3 2 Connecting Online and Transferring the Project Data Connect online with the Sysmac Studio and transfer the project data to the Controller 7 4 Setting Up the Network Set the tag data links for the EtherNet IP 7 4 1 Opening the Network Configuration File and Connecting Online Open the Network Configurator v3 network configuration file and connect online with the Co...

Страница 14: ...switch The unit number is factory set to 0 4 Set the node address setting switches as follows NODE No x161 0 NODE No x160 2 IP address 192 168 250 2 By default the first to third octets of the local IP address are fixed to 192 168 250 The fourth octet is the values that were set with the node address setting switches With the FINS communications service when there are multiple EtherNet IP Units co...

Страница 15: ... computer Switching Hub and PLC as shown in 5 2 Device Configuration 6 Turn ON the power supply to the PLC The set IP address is displayed on the seven segment LED indicators from right to left Afterwards the rightmost 8 bits of the IP address are displayed in hexadecimal during normal operation USB cable LAN cable Switching Hub PLC CPU Unit Power Supply Unit ...

Страница 16: ...C Install the CX One and USB driver in the personal computer beforehand 1 Start the CX Programmer 2 Select Auto Online Direct Online from the PLC Menu 3 The Direct Online Dialog Box is displayed Select the USB Connection Option for Connection Type and click the Connect Button 4 The dialog box on the right is displayed Check the contents and click the No Button ...

Страница 17: ...ach step Refer to Connecting Directly to a CJ2 CPU Unit Using a USB Cable in Chapter 3 Communications in PART 3 CX Server Runtime of the CX Programmer Operation Manual Cat No W466 for details Additional Information The dialogs explained in the following procedures may not be displayed depending on the environmental setting of CX Programmer For details on the environmental setting refer to Options ...

Страница 18: ...e steps below 1 Select Operating Mode Program from the PLC Menu of the CX Programmer 2 The dialog box on the right is displayed Confirm that there is no problem and click the Yes Button Refer to Additional Information on the previous page for the settings concerning the dialog display 3 Confirm that Stop Program Mode is displayed on the right of the PLC model in the project workspace of the CX Pro...

Страница 19: ...ogrammer The PLC IO Table Window is displayed 3 Select Create from the Options Menu of the PLC IO Table Window The dialog box on the right is displayed Confirm that there is no problem and click the Yes Button The dialog box on the right is displayed Confirm that there is no problem and click the Yes Button ...

Страница 20: ... Box and click the Transfer Button When the transfer is completed the Transfer Results Dialog Box is displayed Confirm that the transfer was normally executed by referring to the message in the dialog box When the I O table is created normally the dialog box shows the following Transfer Success 1 Unit Transfer Unsuccessful 0 Unit Click the OK Button ...

Страница 21: ...figuration When you use an EtherNet IP Unit not specified in 5 1 Applicable Devices the display position and name are different from this figure Right click CJ2M EIP21 and select Unit Setup 6 The Edit Parameters Dialog Box is displayed Select the TCP IP Tab Make the following settings in the IP Address Field Use the following address Select IP address 192 168 250 2 Subnet mask 255 255 255 0 Click ...

Страница 22: ...d click the Yes Button Confirm that parameters were normally transferred to the Unit and click the OK Button 8 A dialog box on the right is displayed Check the contents and click the Yes Button When restarting the Unit is executed a dialog box shown on the right is displayed Check the contents and click the OK Button ...

Страница 23: ...nection Procedure 20 9 To confirm that the IP address was correctly changed click the Compare Button 10 After confirming that parameters match click the OK Button 11 Click the OK Button on the Edit Parameters Dialog Box ...

Страница 24: ...nect the USB cable to the peripheral USB port Then connect the personal computer Switching Hub and Controller by referring to 5 2 Device Configuration Turn ON the power supply to the Controller 2 Start the Sysmac Studio Click the Import Button If a confirmation dialog box for an access right is displayed at start select to start 3 The Import File Dialog Box is displayed Select OMRON_CJ2_EIP_EV101 ...

Страница 25: ...c Studio to the version specified in 5 2 Device Configuration or higher version 5 Select Check All Programs from the Project Menu 6 The Build Tab Page is displayed in the Edit Pane Confirm that 0 Errors and 0 Warnings are displayed 7 Select Rebuild Controller from the Project Menu 8 A confirmation dialog box is displayed Confirm that there is no problem and click the Yes Button 9 Confirm that 0 Er...

Страница 26: ...m the Sysmac Studio The devices or machines may perform unexpected operation regardless of the operating mode of the CPU Unit 1 Select Change Device from the Controller Menu 2 The Change Device Dialog Box is displayed Confirm that Device and Version to use are set as shown on the right If the settings are different select the setting items from the pull down list Click the OK Button 3 If the setti...

Страница 27: ...of the Controller does not match that of the project file Match the Controller model and version by changing the device settings of the project file and then repeat the procedure from step 1 in this section Close the dialog box by clicking the OK Button The model and version displayed on the confirmation dialog box differ depending on the Controller used and the device setting of the project file ...

Страница 28: ...rmation dialog box is displayed as shown on the right Confirm that there is no problem and click the Yes Button The displayed dialog box depends on the status of the Controller used Click the Yes Button to proceed with the processing The displayed serial ID differs depending on the device 8 When an online connection is established a yellow bar is displayed on the top of the Edit Pane 9 Select Sync...

Страница 29: ...tton After executing Transfer To Controller the Sysmac Studio data is transferred to the Controller and the data are compared 11 A confirmation dialog box is displayed Confirm that there is no problem and click the Yes Button A screen stating Synchronizing is displayed A confirmation dialog box is displayed Confirm that there is no problem and click the No Button Be sure not to return it to RUN mo...

Страница 30: ...essage is displayed stating The synchronization process successfully finished If there is no problem click the Close Button A message stating The synchronization process successfully finished is displayed if the Sysmac Studio project data and the data in the Controller match If the synchronization fails check the wiring and repeat from step 6 ...

Страница 31: ...or Correct Use Please confirm that the LAN cable is connected before performing the following procedure When it is not connected turn OFF the power supply to each device and then connect the LAN cable 1 Start the Network Configurator 2 Select Open from the File Menu 3 The Open Dialog Box is displayed Select OMRON_CJ2_EIP_EV101 nvf Network Configurator v3 network configuration file and click the Op...

Страница 32: ...ion Pane as shown in the right figure IP address of node 1 192 168 250 1 IP address of node 2192 168 250 2 5 Select Select Interface NJ Series USB Port from the Option Menu 6 Select Connect from the Network Menu 7 The Select Connect Network Port Dialog Box is displayed Select TCP 2 Click the OK Button ...

Страница 33: ...he icon on the right figure changes to blue Additional Information If an online connection cannot be made to the Controller check the cable connection Or return to step 5 check the settings and repeat each step For details refer to 7 2 8 Connecting the Network Configurator to the Network in Section 7 Tag Data Link Functions of the NJ series CPU Unit Built in EtherNet IP Port User s Manual Cat No W...

Страница 34: ...the Controller 1 Select Download from the Network Menu The dialog box on the right is displayed Confirm that there is no problem and click the Yes Button 2 Tag data link parameters are downloaded from the Network Configurator to the Controller 3 The dialog box on the right is displayed Check the contents and click the OK Button ...

Страница 35: ... in EtherNet IP port LED indicators in normal status NET RUN Lit green NET ERR Not lit LINK ACT Flashing yellow Flashing while packets are being sent and received PLC EtherNet IP Unit LED indicators in normal status MS Lit green NS Lit green COMM Lit yellow 100M or 10M Lit yellow Controller EtherNet IP Unit 2 Confirm that the tag data links are normally in operation by checking the status informat...

Страница 36: ...hen the same items in the right dialog box are selected the data links are normally in operation Click the Close Button 4 Select Disconnect from the Network Menu to go offline The color of the icon on the figure changes from blue Select Exit from the File Menu to exit the Network Configurator Number Node number Blue Connection normal ...

Страница 37: ...n regardless of the operating mode of the CPU Unit 1 Select Watch Tab Page from the View Menu 2 The Watch Window1 Tab Page is displayed in the lower section of the Edit Pane 3 The following names are entered in the Watch Window1 Tab Page for monitoring EIP002_D10100_OUT 0 EIP002_D10100_OUT 1 EIP002_D10000_IN 0 EIP002_D10000_IN 1 4 Enter 1234 in the Modify Column of EIP002_D10100_OUT 0 After enteri...

Страница 38: ...that the PLC is in PROGRAM mode If the CX Programmer is online and the PLC is not in PROGRAM mode change to PROGRAM mode by following Section 7 3 2 6 Select Edit Memory from the PLC Menu 7 The PLC Memory Window is displayed Double click D from a list in the PLC Memory Window ...

Страница 39: ...xadecimal from the View Menu 10 Select Monitor from the Online Menu 11 The Monitor Memory Areas Dialog Box is displayed Select the D Check Box and click the Monitor Button 12 The values from D10100 are displayed You can confirm that D10100 is 1234 and D10101 is 5678 as set in step 4 13 Enter 10000 in the Start Address Field ...

Страница 40: ... the Value Field Click the OK Button 16 Confirm that the value of D10000 is 9876 17 Change D10001 to 5432 in the same way as steps 14 to 16 18 Display the Sysmac Studio Confirm that the online values of EIP002_D10000_IN 0 and EIP002_D10000_IN 0 are 9876 and 5432 You can confirm that the values are the same as the ones set in steps 14 to 17 ...

Страница 41: ...e before the initialization 8 1 1 EtherNet IP port Delete the connection information and tag information that are set for the EtherNet IP port Follow the procedure below to set blank connection information and blank tag information and delete them using the Network Configurator 1 Deleting connection information In the Connections Tab Page of the Edit Device Parameters Dialog Box move all devices r...

Страница 42: ...e of the Edit Parameters Dialog Box click the Delete all of unused Tag Sets Button If a confirmation dialog box is displayed when deleting click the Yes Button 3 Download Right click the Controller and select Parameter Download from the menu that is displayed No registered tags ...

Страница 43: ...hod 40 8 1 2 CPU Unit To initialize the settings of the CPU Unit select Clear All Memory from the Controller Menu of the Sysmac Studio The Clear All Memory Dialog Box is displayed Check the contents and click the OK Button ...

Страница 44: ...t click the EtherNet IP Unit on the PLC IO Table Window and select Unit Setup from the menu 2 Click the Restart Button on the Edit Parameters Dialog Box 3 A dialog box is displayed confirming the execution Confirm that there is no problem and click the Yes Button Then on the Restart Unit Dialog Box select the Return to out of box configuration and then emulate cycling power Option and click the OK...

Страница 45: ... 8 2 2 CPU Unit To initialize the settings of the CPU Unit select Clear All Memory Areas from the PLC Menu of the CX Programmer On the Confirm All Memory Area Clear Dialog Box select the Initialize Option and click the OK Button ...

Страница 46: ...pecify an array for a data type After specifying 1 is converted to 2 and the data type is always displayed as 2 1 WORD 3 2 ARRAY 0 2 OF WORD In this document the data type is simplified by displaying WORD 3 The example above means a WORD data type with three array elements 9 2 Relationship between Destination Device and Global Variables Global variables need to be arranged in offset order of the d...

Страница 47: ...t with the destination device information and create tag data link parameters The numbers shown in the tables below correspond to the steps above Output area Controller PLC Controller setting Set with Sysmac Studio Data link table setting Set with Network Configurator Destination device information 1 Tag set EIP002_OUT 20byte 4 D10100 20Byte Global variable 3 Tag list EIP002_D1010 0_OUT WORD 10 2 ...

Страница 48: ...figuration files 10 1 Overview of Setting Tag Data Links The following is the relationship between the processes to operate the tag data links using the procedure for setting parameters from the beginning Settings made with Sysmac Studio Setting parameters IP address etc Setting global variables name network setting and task setting etc Exporting global variables Building Transferring the Project ...

Страница 49: ...and wire the network 7 2 2 Starting the CX Programmer and Connecting Online with the PLC Start the CX Programmer and connect online with the PLC 7 2 3 Parameter Settings Create the I O table for the PLC and set the IP address 10 3 Setting Up the Controller Using the Software Set up the Controller using the software 10 3 1 Starting the Sysmac Studio and Setting the Parameters for the Controller Sta...

Страница 50: ...egistering the Tags and Setting the Tag Sets Import the CSV file that was saved register tags of the originator s send area and receive area and set the tag sets 10 4 4 Setting the Connection Associate the tags of the target device with the tags of the originator 10 4 5 Transferring the Tag Data Link Parameters Transfer the set tag data link parameters to the Controller 7 5 Checking EtherNet IP Co...

Страница 51: ...udio and set the parameters for the Controller Install the Sysmac Studio and USB driver in the personal computer beforehand 1 Connect the LAN cable and the USB cable to the Controller and turn ON the power supply to the Controller For details refer to step 1 of 7 3 1 Starting the Sysmac Studio and Importing the Project File 2 Start the Sysmac Studio Click the New Project Button If a confirmation d...

Страница 52: ...evice that you use are set in the Select Device Field Select version 1 05 from the pull down list of Version Although 1 05 is selected in this document select the version you actually use 4 Click the Create Button 5 The New Project is displayed The left pane is called Multiview Explorer the right pane is called Toolbox and the middle pane is called Edit Pane Edit Pane Toolbox Multiview Explorer ...

Страница 53: ...Configurations and Setup Controller Setup in the Multiview Explorer 7 The Built in EtherNet IP Port Settings Tab Page is displayed in the Edit Pane Click the TCP IP Setting Button select the Fixed Setting Check Box in the IP Address Field and make the following settings IP address 192 168 250 1 Subnet mask 255 255 255 0 ...

Страница 54: ...g Data in the Multiview Explorer 2 The Global Variables Tab Page is displayed in the Edit Pane Click a column under the Name Column to enter a new variable Enter EIP002_D10100_OUT in the Name Column Enter WORD 10 in the Data Type Column After entering the value changes to ARRAY 0 9 OF WORD as shown on the right Select the Retain Check Box to retain the value Select Output from the Network Publish ...

Страница 55: ...under Configurations and Setup in the Multiview Explorer The Task Settings Tab Page is displayed in the Edit Pane Click the Settings for Exclusive Control Variables in Tasks Button Click the Button 6 Click the Down Button under Variable to be refreshed The variables set in steps 2 to 4 are displayed Select EIP002_D10100_OUT 8 Click the Button and select a variable to be refreshed The data types ar...

Страница 56: ...e click Global Variables under Programming Data in the Multiview Explorer 2 The Global Variables Tab Page is displayed in the Edit Pane Right click on the pane and Select Select All All the selected variables are highlighted 3 Select Export Global Variables Network Configurator from the Tools Menu 4 The Save As Dialog Box is displayed Enter EIP002 in the File name Field Click the Save Button ...

Страница 57: ...or CJ series Units from the Sysmac Studio The devices or machines may perform unexpected operation regardless of the operating mode of the CPU Unit 1 Select Check All Programs from the Project Menu 2 The Build Tab Page is displayed in the Edit Pane Confirm that 0 Errors and 0 Warnings are displayed 3 Select Rebuild Controller from the Project Menu 4 A confirmation dialog box is displayed Check the...

Страница 58: ... click the Yes Button The displayed dialog box depends on the status of the Controller used Check the contents and click the Yes Button to proceed with the processing 9 When an online connection is established a yellow bar is displayed on the top of the Edit Pane Additional Information For details on online connections to a Controller refer to Section 5 Online Connections to a Controller of the Sy...

Страница 59: ...Controller Button After executing Transfer To Controller the Sysmac Studio data is transferred to the Controller and the data are compared 12 A confirmation dialog box is displayed Confirm that there is no problem and click the Yes Button A screen stating Synchronizing is displayed A confirmation dialog box is displayed Confirm that there is no problem and click the No Button Be sure not to return...

Страница 60: ...and that a message is displayed stating The synchronization process successfully finished If there is no problem click the Close Button A message stating The synchronization process successfully finished is displayed if the Sysmac Studio project data and the data in the Controller match If the synchronization fails check the wiring and repeat from step 1 ...

Страница 61: ...tch Tab Page from the View Menu 2 The Watch Window1 Tab Page is displayed in the lower section of the Edit Pane 3 Enter the following names in the Watch1 Tab Page for monitoring To enter a new name click a column stating Input Name EIP002_D10100_OUT 0 EIP002_D10100_OUT 1 EIP002_D10000_IN 0 EIP002_D10000_IN 1 You will use the settings in 7 5 2 Checking the Data That are Sent and Received ...

Страница 62: ...ct online with the Controller and upload the network configuration Precautions for Correct Use Please confirm that the LAN cable is connected before performing the following procedure When it is not connected turn OFF the power supply to each device and then connect the LAN cable 1 Start the Network Configurator 2 Select Select Interface NJ Series USB Port from the Option Menu 3 Select Connect fro...

Страница 63: ...ect Network Port Dialog Box is displayed Select TCP 2 Click the OK Button 5 The Select Connected Network Dialog Box is displayed Check the contents and click the OK Button 6 When an online connection is established normally the color of the icon on the right figure changes to blue ...

Страница 64: ...CPU Unit Built in EtherNet IPTM Port User s Manual Cat No W506 7 Select Upload from the Network Menu to upload the device information on the network 8 The dialog box on the right is displayed Confirm that there is no problem and click the Yes Button 9 The Target Device Dialog Box is displayed Select the192 168 250 1 Checkbox and the 192 168 250 2 Checkbox and click the OK Button If 192 168 250 1 o...

Страница 65: ...When uploading is completed the dialog box on the right is displayed Check the contents and click the OK Button 11 After uploading is completed confirm that the Network Configuration Pane shows the updated IP addresses of the devices IP address of node 1 192 168 250 1 IP address of node 2 192 168 250 2 ...

Страница 66: ...e tags and tag sets of the send area and receive area of the PLC 1 Right click the node 2 device and select Parameter Edit 2 The Edit Device Parameters Dialog Box is displayed Click the Tab Sets Tab 3 Click the In Consume Tab Click the New Button 4 A confirmation dialog box is displayed Click the Yes Button ...

Страница 67: ...Links Using the Software 64 5 The Edit Tags Dialog Box is displayed Select the In Consume Tab and click the New Button 6 The Edit Tag Dialog Box is displayed Set the following values and click the Regist Button Name D10100 Size 20 bytes ...

Страница 68: ...x 2 Setting the Tag Data Links Using the Software 65 7 Click the Close Button 8 The Edit Tag Dialog Box is displayed Confirm that D10100 and 20Byte are displayed 9 Select the Out Produce Tab Click the New Button ...

Страница 69: ... Appendix 2 Setting the Tag Data Links Using the Software 66 10 The Edit Tag Dialog Box is displayed Set the following values and click the Regist Button Name D10000 Size 20 Byte 11 Click the Close Button ...

Страница 70: ...gs Dialog Box is displayed Confirm that D10000 and 20Byte are displayed After confirming click the OK Button 13 Click the Yes Button 14 The Edit Device Parameters Dialog Box is displayed D10100 and 20Byte are displayed 15 Click the Out Produce Tab D10000 and 20Byte are displayed ...

Страница 71: ...10 Appendix 2 Setting the Tag Data Links Using the Software 68 16 Click the OK Button ...

Страница 72: ...s of the originator s send area and receive area and set the tag sets This section explains the receive settings and then send settings of the target node 1 On the Network Configuration Pane of the Network Configurator right click the node 1 device and select Parameter Edit 2 The Edit Device Parameters Dialog Box is displayed Click the To From File Button 3 Select Import from File ...

Страница 73: ... Global Variables 5 The right dialog boxes may not be displayed depending on the status of the Controller and software used In such a case proceed to the next step The right dialog box is displayed Confirm that there is no problem and click the Yes Button The right dialog box is displayed Confirm that there is no problem and click the No Button Make sure that tag sets are not created automatically...

Страница 74: ...ab and click the Edit Tags Here register an area node 2 node 1 where node 1 receives data 8 The Edit Tags Dialog Box is displayed Select the In Consume Tab The tab page shows the variable name that was set in 10 3 2 Setting the Global Variables and that is listed in 9 2 Relationship between Destination Device and Global Variables ...

Страница 75: ...the same way as the previous step the tab page shows the variable name that was set in 10 3 2 Setting the Global Variables and that is listed in 9 2 Relationship between Destination Device and Global Variables Click the OK Button 10 The Edit Tags Dialog Box is displayed again Click the New Button ...

Страница 76: ...click the Button 12 EIP002_D10000_IN moves to the Tag List Move all variables from the Candidate Tag List to the Tag List in the same way 13 Enter EIP002_IN in the Name Field Click the Regist Button 14 The Edit Device Parameters Dialog Box is displayed Click the Close Button 15 The Edit Device Parameters Dialog Box is displayed EIP002_IN and 20Byte are displayed ...

Страница 77: ...he New Button 17 The Edit Tag Set Dialog Box is displayed Move the variables from the Candidate Tag List to the Tag List in the same way as steps 11 and 12 Make sure that the data in the Tag List is arranged in order of offsets shown in 9 2 Relationship between Destination Device and Global Variables ...

Страница 78: ... Software 75 18 Enter EIP002_OUT in the Name Field Click the Regist Button 19 The Edit Tag Set Dialog Box is displayed Click the Close Button 20 The Edit Tags Dialog Box is displayed again EIP002_OUT and 20Byte are displayed Select the Connections Tab ...

Страница 79: ...that is shown in the dialog box 2 192 168 250 2 is registered in the Register Device List Select 192 168 250 2 and click the New Button 3 The Edit Connection Dialog Box is displayed Select the following values from the pull down lists for the settings in the Originator Device Field and the Target Device Field Settings of connection Connection allocation Setting value Input Tag Set EIP002_IN 20Byte...

Страница 80: ...x is displayed again Click the Close Button 6 The Edit Device Parameters Dialog Box is displayed again Click the OK Button 7 When the connection is completely allocated the registration destination node address is displayed under the device icon of the destination device on the Network Configuration Pane 8 Right click the node 2 device and select Parameter Edit ...

Страница 81: ...nd click the New Button 11 The Edit Connection Dialog Box is displayed Select the following values from the pull down lists for the settings in the Originator Device Field and the Target Device Field Settings of connection Connection allocation Setting value Input Tag Set D10100 20Byte Originator device Connection Type Multi cast connection Target Device Output Tag Set EIP002_OUT 20Byte 12 Confirm...

Страница 82: ...displayed again Click the Close Button 14 The Edit Device Parameters Dialog Box is displayed again Click the OK Button 15 When the connection is completely allocated the registration destination node address is displayed under the device icon of the destination device on the Network Configuration Pane ...

Страница 83: ... parameters to the Controller 1 Select Download from the Network Menu The dialog box on the right is displayed Confirm that there is no problem and click the Yes Button 2 Tag data link parameters are downloaded from the Network Configurator to the Controller 3 The dialog box on the right is displayed Check the contents and click the OK Button ...

Страница 84: ...11 Revision History 81 11 Revision History Revision code Date of revision Revision reason and revision page 01 Sep 6 2013 First edition ...

Страница 85: ...82 ...

Страница 86: ...2013 0911 P568 E1 01 ...

Отзывы: