7. EtherNet/IP Connection Procedure
14
5
The dialog box on the right is
displayed, and the
CX-Programmer and the PLC is
automatically connected.
6
Confirm that the
CX-Programmer and the PLC
are normally connected online.
*The
icon is pressed down
during online connection.
Additional Information
If the CX-Programmer and PLC are not connected online, please check the connection of the
cable.
Or, return to step 2, check the settings and repeat each step.
Refer to
Connecting Directly to a CJ2 CPU Unit Using a USB Cable
in
Chapter 3
Communications
in
PART 3: CX-Server Runtime
of the
CX-Programmer Operation Manual
(Cat. No. W466) for details.
Additional Information
The dialogs explained in the following procedures may not be displayed depending on the
environmental setting of CX-Programmer.
For details on the environmental setting, refer to
Options and Preferences
in
Chapter 3
Project Reference
in
PART 1: CX-Programmer
of the
CX-Programmer Operation Manual
(Cat. No. W466). This document explains the setting procedure when the Confirm all
operations affecting the PLC Check Box is selected.
Содержание NJ-series
Страница 71: ...10 Appendix 2 Setting the Tag Data Links Using the Software 68 16 Click the OK Button ...
Страница 85: ...82 ...
Страница 86: ...2013 0911 P568 E1 01 ...