6
Multi-channel Power Controller
G3ZA
■
Connection Configuration
Single-phase SSR
Note:
Connect a power supply with the same phase as the SSRs to
the load power supply terminals on the G3ZA.
Three-phase SSR
Note:
Connect to one of the three phases on the load power supply
input terminals of the G3ZA.
■
Host Device Connection Example
Example of Connection to EJ1 Modular Temperature Controller
Example of Connection to PLC
Trigger
signal
G3ZA
Example for Connecting Two SSRs
R phase
S phase
T phase
Host device
Control
power
supply
SSR
CT (4-channel model only)
SSR
Load
(e.g., heater)
Load
(e.g., heater)
Load power
supply
V2
G3ZA
R phase
S phase
T phase
Host device
Control
power
supply
Load
Trigger signal
SSR
(three-
phase)
CT (4-channel model only)
Load power
supply
Eight SSRs
Eight SSRs
Eight SSRs
SW2
SW1
ERROR
OCC
SD/RD
READY
G3ZA
PC
PLC
PT
PC
EJ1N-TC4
or
EJ1N-TC2
EJ1C-EDU
Port A (connector): USB connection possible
using a E58-CIFQ1 (sold separately)
Port B: RS-485 (CompoWay/F)
COM1
COM2
COM3
PWR
RUN
ERR
ALM
SW1
ON
SW2
2
13
4
5
6
7
8
EJ1-TC4
01
2345
678
9A
BC
DEF
COM1
COM2
COM3
PWR
RUN
ERR
ALM
SW1
ON
SW2
2
13
4
5
6
7
8
EJ1-TC4
01
2345
678
9A
BC
DEF
COM1
COM2
COM3
PWR
RUN
ERR
ALM
SW1
ON
SW2
2
13
4
5
6
7
8
EJ1-TC4
01
2345
678
9A
BC
DEF
SW2
SW1
ERROR
OCC
SD/RD
READY
SW2
SW1
ERROR
OCC
SD/RD
READY
G3ZA
G3ZA
Host Devices
G3ZA
Connection port
G3ZA
Connection port
G3ZA
Connection port
CX-Thermo for setup
PLC
Alarm output
Load power supply
(for zero-cross detection)
Power supply for
Multi-channel
Power Controller
RS-485
Heater
G3ZA
SSR
Содержание G3ZA
Страница 17: ...Solid State Relays G3PA 17 ...
Страница 18: ...18 Solid State Relays G3PA ...
Страница 19: ...Solid State Relays G3PA 19 ...