Appendices
A-2
Appendices
Specifications
■
Ratings
Supply voltage
100 to 240 VAC, 50/60 Hz
24 VAC, 50/60 Hz/24 VDC
Operating voltage
range
85 to 110% of rated supply voltage
Power
consumption
5 VA
3 VA/2 W
Sensor input
*1
Thermocouple input type: K, J, L
Platinum resistance thermometer input type: Pt100, JPt100
Thermistor: E52-THE
@@
Multi-input (thermocouple/platinum resistance thermometer) type: K, J, L, T, U,
N, R, Pt100, JPt100
E5CSV
SPST-NO, 250 VAC, 3A (resistive load) Electrical
durability: 100,000 operations
Min. applicable load: 5 V, 10 mA
Relay output
E5CS-U
SPDT, 250 VAC, 3A (resistive load)
Electrical durability: 100,000 operations
Min. applicable load 5 V 10 mA
Control output
Voltage output
(for driving the
SSR)
12 VDC, 21 mA
Alarm output
SPST-NO, 250 VAC, 1A (resistive load)
Electrical durability: 100,000 operations
Min. applicable load: 5 V, 10 mA
Control method
ON/OFF or 2-PID (with auto tuning)
Setting method
Digital setting using front panel keys
Indication method
7-segment digital display (character height: 13.5 mm) and deviation indicators
Other functions
•
Setting change prohibit (key protection)
•
Input shift
•
Temperature unit change (
°
C/
°
F)
•
Direct/reverse operation
•
Temperature range, Sensor switching
*2
(K/J/L, Pt100/JPt100)
•
Control period switching
•
9-mode alarm output
•
Sensor error detection (except thermistor models)
Ambient
temperature
−
10 to 55°C (with no condensation or icing); with 3-year guarantee:
−
10 to 50°C
Ambient humidity
25% to 85%
Storage
temperature
−
25 to 65°C (with no condensation or icing)
Altitude
2,000 m or less
Recommended
fuse
T2A, 250 VAC, time lag, low shut-off capacity
Installation
environment
Installation Category II, Pollution Class 2 (IEC 61010-1 compliant)
*1.
For the setting ranges for each sensor input, see page A-12.
*2. Switching is performed between a thermocouple and platinum resistance thermometer for multi-input
models (i.e., models that support both thermocouple and platinum resistance thermometer input).
Содержание E5CS-U
Страница 2: ......
Страница 17: ...xv ...
Страница 63: ...Section 4 Operations for Applications 4 10 Operations for Applications ...