G-213
D4NH
D4
N
H
Arm Lever Type with 2 Conduits
Note: 1.
Unless otherwise specified, a tolerance of
±
0.4 mm applies to all dimensions.
2.
Variation occurs in the simultaneity of contact opening/closing operations of 2NC, 2NC/1NO, and 3NC contacts. Check contact operation.
3.
There are a minimum of five turns of the screw thread for a Pg13.5 conduit opening and four turns minimum for a G 1/2 conduit opening.
4.
Refer to the following diagram for details on M12 connectors.
1-conduit M12 Connector
Application Examples of Arm Lever Use
Note:
Be sure to evaluate the Switch under actual working conditions after installation.
Red
Black
20.5
×
20.5
25 dia.
2.15
±
0.05R
mounting holes
Conduit cap
(See note 3.)
0
Two, 4
+0.15
dia. holes
Depth: 5
Cap
22
±
0.1
20
±
0.1
42
±
0.1
40
±
0.1
56 max.
(3)
42
±
0.2
18
47
20.5
29
±
1
43
80
27.5
(26.7)
(10.3)
1.5
11
±
0.2
21.5
5.1
16
5.4
39
±
0.2
9
±
0.2
2.5
14.2
(16.5)
(37.9)
D4NH-5
@
BC
D4NH-6
@
BC
D4NH-7
@
BC
D4NH-8
@
BC
OF max.
0.15 N·m
PT 1 (NC)
PT 2 (NO)
(7
°
) (MBB: 10
°
)
(19
°
) (MBB: 5
°
)
DOT min.
DOF min.
18
°
1 N·m
(14)
M12
×
1
14.2
30
D4NH-9
@@@
When Installing at the Center
The arm lever is set for center installation
at the time of shipment.
When Installing to the Left
Remove the screw and arm lever, position
the arm lever to the left, and then secure it
with the screw.
When Installing to the Right
Remove the screw and arm lever, position
the arm lever to the right, and then secure
it with the screw.
Note: Install the arm lever so that it will not ro-
tate more than 90
°
.
Note: Install the arm lever so that it will not ro-
tate more than 180
°
.
Note: Install the arm lever so that it will not ro-
tate more than 180
°
.
F502-EN2-04.book Seite 213 Dienstag, 26. Juli 2005 5:48 17