4.7 PNEUMATIC CONNECTION
The pneumatic plant must be calibrated at a working pressure of 6 bar.
The phases of pneumatic connection should be as follows:
-
connect the group to the plant’s main grid where indicated (1);
-
check that the connection point is perfectly tightened;
-
adjust machine pressure with the knob (2);
-
set to 6 bar.
Connection to the pneumatic circuit is carried out through a
quick coupling joint located on the column. Air pressure
must be
6 bar
.