Screw the flasks fixed to the carriage to the flasks and distance pieces fixed to the column.
Tighten all screws, bolts and lock nuts of every adjustable mechanical element following
normal tightening values, without using any levers or hitting any spanners.
Anchorage operations, if foreseen, must be carried out by authorized and appropriately
trained staff.
4.5 PRELIMINARY INSPECTIONS
The machine is inspected in the offices of the company of the Builder before being sent, so it is not
necessary to follow any particular procedure before it is operated.
The first time the machine is run, follow these instructions:
-
check that the machine has not had any damages during transport and handling;
-
check that the electric cables are intact;
-
check that the machine is correctly connected to the power supply;
-
check that all mobile and fixed guards and all safety equipment are correctly installed;
-
check that all control sensors are in the correct position.
Omni
SUPERPLUS EN IGM_REV6
36
Содержание Superplus
Страница 1: ...Omni Superplus...
Страница 16: ...Omni SUPERPLUS EN IGM_REV6 19...
Страница 17: ...Do not remove plates or pictograms Omni SUPERPLUS EN IGM_REV6 20...