6.
Equipment Installation
8
Follow rigorously below instructions:
1- Remove the equipment from its box and verify for any possible damages, caused by the
transportation.
2- Install the controller in a strategic place, of ease access and operation, free of vibrations and
vapors.
3- Avoid direct exposure of the controller to solar rays and in case if necessary, protect the controller.
4- Proceed with terminal connections of cables at terminal barr.
5- Inspect the electrical installation in order to certify that all connections are correct.
6- Verify the power that is being supplied and make sure to connect it the proper place.
7- Connect the circuit breakers from the power distribution box.
3.1. Important Recommendations
3.1.1. The equipment
must be
Being
so, the power cable of Control Valves, Solenoids, Alarms, etc, must be connected directly at the
Distribution Box, and
"
"
at the equipment connection board.
3.1.2.
if the equipment
are providing the proper sealing to the cable inlets.
IP-67.
3.1.3.
. It reduces impedance, generating measuring errors. Verify the
cable knockout and if necessary,
using a hair dryer.
3.1.4. s
length,
Contact OMEGA Customer Service.
Electrical Power
independent
never
Verify cable
knockouts
Be careful with Humidity!!
dry the connection block
Do not cut or try to attach the connection cable.
from other system components.
This proceeding is a must in order to preserve enclosure as
In case you need to change it
Sensor Cable
RF Shield
Meas.
Yellow
Green
Electr. Shield
3.1.5. ON-OFF
are
, offering innumerous advantages for the equipment, such
as: no presence of sparks, faster commutation, noise practically un-existent, no presence of RF
interference and many more.
The outputs can commute any charge, since they are
, l
.
outputs
thyristor
powered by alternate tension (VAC)
imited to
250V / 1A
type