![background image](http://html.mh-extra.com/html/omega/hh550/hh550_user-manual_737492058.webp)
53
Operation of connecting with other meters :
A. Tes meters :
a). Move mouse pointer to “Option” then click. And move mouse pointer
to “Setup” then click this button.
b) In the window “SETUP”, move mouse pointer to “TES METER” which
is under the title “MODE” then click this option button.
c). Select an expected meter and then press “OK” to complete.
B. Other meters not in the list :
a). Move mouse pointer to “Option” then click. And move mouse pointer
to “Setup” then click this button.
b). Comply with the output voltage / current of which meters then refer
to P.27 (7).
c). Comply with the unit of which meters then refer to P.28 (8).
Содержание HH550
Страница 1: ......
Страница 2: ......
Страница 3: ......
Страница 23: ...18 A Run window appears then type A SETUP or B SETUP and press OK Setup program will run automatically ...
Страница 24: ...19 ê ê Click NEXT a Click NEXT or b If willing to set up on a different folder click Browse ...
Страница 25: ...20 Click NEXT ...
Страница 60: ......
Страница 61: ...2 ...
Страница 62: ......