background image

CDi-16B - Installation and operating manual 

www.omega-air.si 

 

 

 

Trapped air prevents the condensate being purged from drain (5). During installation ensure 
that no water pockets are formed in the piping (6).  

 

 

When drainage is to take place directly from a pipeline it is recommended to arrange the 
piping so that air flow is diverted (8). 

 

10 

 

 

 

Содержание CDi-16B

Страница 1: ...tion and operating manual CDi 16B Please read the following instructions carefully before installing electronic drain unit into service Trouble free and safe operating of the unit can only be guarante...

Страница 2: ...ng 21 95x1 78 4 Damper 14 Screw plug 1 2 24 Screw PT KA 35x16 34 Screw KA 30x8 5 Valve housing 15 Connection Al 50 25 Foil keyboard 35 Screw KA 30x8 6 Plunger 16 Fixing screw 1 8 26 O ring 38 0x3 0 36...

Страница 3: ...5 C 35 to 149 F Upper Inlet connection G 1 2 BSP Lower Inlet connection G 1 2 BSP Outlet connection G 1 8 BSP Power interface 3 x 0 5mm 2 Protection class IP65 Volume 0 1 l Mass 0 96 kg Dimensions A x...

Страница 4: ...abel Do not use the device in hazardous areas with potentially explosive atmospheres Use original spare parts only Use the device for the appropriate purpose only Appropriate use CDi 16B series electr...

Страница 5: ...gnal to electronic board Electromagnetic valve 4 is than opened to discharge accumulated condensate through outlet connection 5 When reservoir 2 has been emptied the valve 4 closes back without any lo...

Страница 6: ...commended Install ball valves 2 only Recommended connection 4 to water oil separator 1 2 The inclination of the unit must not exceed 5 in both axes If device is not installed correctly it could cause...

Страница 7: ...ped air prevents the condensate being purged from drain 5 During installation ensure that no water pockets are formed in the piping 6 7 8 When drainage is to take place directly from a pipeline it is...

Страница 8: ...11 Warning Upper and back connections cannot be used as condensate inlet at the same time 13 14 STANDARD INSTALLATION Upper connection Inlet Back connection Closed VENTING LINE INSTALLATION Upper con...

Страница 9: ...ctions LED indicator TEST button LED indicator LED indicates device condition 1 Green ON Power on reservoir empty waiting condensate to accumulate 2 Green FLASHES Device is discharging condensate 3 Re...

Страница 10: ...osed for one second This cycle repeats for five minutes up to 100 discharges In case the reservoir empties during overload mode device enters normal mode again ALARM If drain was still not able to dis...

Страница 11: ...nce work take the drain out of operation switch off the power supply and depressurize the unit Service kits Based on type of CDi 16B drain following servis kits can be used SERVIS KIT CDI 16 B 230V SE...

Страница 12: ...lisation passed by After connection wait 2 sec for system initialisation Check for voltage in circuit Check the cable and power connection Connect CDi 16B to proper voltage Mistake must be repaired by...

Отзывы: