7
Installation
Ensure gas supply and gas type, are as shown on unit nameplate.
Unit installation must conform with the National Fuel Gas Code, ANSI Z223.1/NFPA 54, the National
Gas Installation Code, CSA-B149.1, or the Propane Installation Code, CSA-B149.2 as applicable and in
accordance with local codes.
Screw legs into the permanently fastened nuts on the four corners of the unit and tighten by hand. Level
the unit by turning the adjustment screw at the bottom of each leg. Do not slide unit with legs mounted, lift if
necessary to move unit.
Pipe threading compound must be resistant to the action of liquefied petroleum gases.
Caution: DO NOT use an open flame to check for leaks. Check all gas piping for leaks with a soap and
water solution before operating unit.
THESE UNITS ARE SUITABLE FOR INSTALLATION ON NON-COMBUSTIBLE
SURFACES ONLY
Combustible clearances:
•
6” sides (152 mm).
•
6” rear (152 mm).
• 4” floor (102 mm).
Noncombustible clearances:
•
0” sides (0 mm).
•
0” rear (0 mm).
• 4” floor (102 mm).
Do not obstruct the flow of combustion and ventilation air, under the unit by the legs or behind the unit by
the flue. Adequate clearance for air openings into the combustion chamber is required. Do not place objects
between the bottom of the unit and the counter top. There must be adequate clearance for removal of the front
panel. All major parts except the burners are removable thru the front if the gas line is disconnected.
CONVERSION
These instructions are for the conversion from Natural Gas to Propane (L.P.) on all models. The conversion
should be done before connecting the unit to the gas supply. Units are shipped from the factory equipped for
use on natural gas.