62.
Place 1st
Roof Ridge Cap
on roof peak overhanging shingles
by approximately 1”. Attach with
2 - 1 1/2” Shingle Nails
9” from
end. Place 2nd Ridge Cap 1” back from first cap. Attach with
2 - 1
1/2” Shingle Nails
9” from end. Alternate each Ridge Cap seam as
you proceed.
Parts (Steps 62-63)
Roof Ridge Caps Long x 28
Roof Ridge Caps Short x 1
Hardware (Steps 62-63)
N2
- 1 1/2” Shingle Nails
x 60 total
Alternate Ride Cap seams (offsetting angle cut at peak)
Important:
Butt (thick) end
of Ridge Cap will be facing
towards the outside of shed.
9” from end
Thin End
61.
To further secure roof panels, from the inside, drill 1/8” pilot holes in
each single rafter (3 per rafter) on an angle. Using
3 - 2 1/2” screws
, per
rafter secure rafters to roof plywood.
Note:
from outside, have a helper
push roof panel down so plywood sits flush against rafter when securing.
3 - 2 1/2” angle screwed
into each mid rafter.
Hardware (Step 61)
S1
- 2 1/2” Screws
x 24 total
Mid Rafter
Roof Plywood
4 - 90 degree
Simpson Ties / Gable.
60.
Position
4 - 90° Metal Brackets
onto the roof plywood and
outside Rafter and secure with
4 - 1 1/4” screws each
.
Complete for both Gables. There are 8 brackets total (4 per side).
Hardware (Step 60)
S2
- 1 1/4” Screws
x 32 total
Y2 - 90° Metal Bracket
x 8 total
4 - 1 1/4” Screws
into each bracket
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 33