manualshive.com logo in svg
background image

03HEL0808DDFW-V1

N/A

Overlap

Cladding

Shiplap

Cladding

Solid Sheet

Roof

T&G Roof

Solid Sheet

Floor

T&G Floor

Fixed

Windows

Opening

Windows

No

Windows

8x8 Helios Summerhouse

For Assistance Please 

Contact Customer Care on 

01636 880514

2mm Drill bit

x2

Winter = High Moisture = Expansion

Summer = Low Moisture = Contraction

All building’s should be erected by two 

adults

For ease of assembly, it is advisable to 

pilot drill all screw holes and ensure 

all screw heads are countersunk.

BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY 

- Check the pack and make sure you have all the parts listed. 

- When you are ready to start, make sure you have the right tools at hand 

(not supplied) including  a Phillips screwdriver, Stanley knife, wood saw, 

step ladder and drill with 2mm bit.

- Ensure there is plenty of space and a clean dry area for assembly. 

TIMBER

As with all natural materials, timber can be affected during various weather 

conditions. For the duration of heavy or extended periods of rain, swelling of the 

wood panels may occur. Warping of the wood may also occur during excessive 

dry spells due to an interior moisture loss. Unfortunately, these processes cannot 

be avoided but can be helped. It is suggested that the outdoor building is 

sprayed with water during extended periods of warm sunshine and sheltered as 

much as possible during rain or snow. 

Our buildings are pre treated with a water based treatment**; this only helps to 

protect the product during transit and for upto 3 months against mould.  To 

validate your guarantee and ensure longevity of the product, it is ESSENTIAL the 

building is treated with a wood preserver within the first three months of 

assembly and thereafter in accordance with the manufactures recommenda-

tions.  Care must be taken to ensure the product is placed on a suitable base.

BUILDING A BASE

When thinking about where the building and base is going to be constructed: 

Ensure that there will be access to all sides for maintenance work and annual 

treatment.

Whilst all products manufactured  are made to the 
highest standards of Safety and in the case of childrens 
products independently tested to EN71 level, we cannot 
accept responsibility for your safety whilst erecting or 
using this product.

Mercia Garden Products Limited, Sutton On Trent, Newark, Nottinghamshire, NG23 6QN

www.merciagardenproducts.co.uk

CAUTION

Every effort has been made during the 

manufacturing process to eliminate the 

prospect of splinters on rough surfaces 

of the timber.  You are strongly advised 

to wear gloves when working with or 

handling rough sawn timer.

**Protim Fentex E5**

Biocidal Product Regulation (EU 528/2012) Article 58 Information

Protim Fentex E2 preserved wood is a “treated article” which incorporates biocidal products. 

Wood correctly preserved with Protim Fentex E2 is protected against mould in storage. 

Contains: IPBC (3-iodo-2-propynyl-N-butyl carbamate) and propiconazole.

Wear gloves when handling freshly treated wood. 

Avoid breathing dust when cutting treated or untreated wood. 

Dispose of off-cuts responsibly – do not burn.

Ensure the base is level and is built on firm ground, to prevent distortion.  Refer 

to diagrams for the base dimensions,  The base should be slightly smaller than 

the external measurement of the building, i.e. The cladding should overlap the 

base, creating a run off for water. It is also recommended that the floor be at 

least 25mm above the surrounding ground level to avoid flooding.

TYPES OF BASE

- Concrete 75mm laid on top of 75mm hard-core.

- Slabs laid on 50mm of sharp sand.

Please retain product label and instructions for future reference

             

P 1

General Instructions

03HEL1008DDFW-V2

10x8 Helios Summerhouse

03HEL1010DDFW-V2

10x10 Helios Summerhouse

Refer to the instructions pages for you specific product code

Содержание 03HEL1010DDFW-V2

Страница 1: ...is placed on a suitable base BUILDING A BASE When thinking about where the building and base is going to be constructed Ensure that there will be access to all sides for maintenance work and annual treatment Whilst all products manufactured are made to the highest standards of Safety and in the case of childrens products independently tested to EN71 level we cannot accept responsibility for your s...

Страница 2: ... End 2536mm 24 Door Bar 1705mm 25 2x Posts 2044mm 26 2x Door Beading 1711mm 27 Finial 31 Turn Button QTY 2 30 Flush Hinge QTY 6 Key Plate 29 28 Door Handle QTY 2 32 Mortice Lock 33 Barrel Bolt QTY 2 34 x4 Rain Guard 580mm Plain Side QTY 2 Felt 50mm Screw x57 40mm Screw x105 Felt Tacks x185 30mm Screw x133 60mm Screw x80 30mm Black Screw x2 Nail Bag Pre Assembly Remove the transportation blocks fro...

Страница 3: ...the screws provided Fix the door handles and the metal bar spindle using 8x30mm screws Ensure the mortice lock opens and closes freely If not remove the lock and turn the catch around using the small grub screw 8x30mm Screws 30mm screw Pre drill hole Step 2 Continued Fix the door bar to the inside of the slave door with 6x30mm screws as shown in the illustration Attach the door beading strips to t...

Страница 4: ... a b b b b b b Step 4 Fix the second gable to the plain side at the corner using 3x60mm screws Do NOT secure to the floor until the roof has been fitted Attach the posts to the front of each gable with 3x60mm screws per post 9x60mm Screws a b 25 25 2 3 a a a a b b a a Step 5 Secure the left right window panels to the posts using 3x60mm screws per panel Do NOT secure the assembly to the floor until...

Страница 5: ... fix the front roof internally to the roof support bar using 4x40mm screws 8x40mm Screws 40mm screw Pre drill hole 40mm screw Pre drill hole 80mm screw Step 6 Place the first ridge bar inside the building and line up with the upright framing on each gable Align the back edge of the ridge bar with the top of the gable Once in place mark the position on both sides with a pencil Place the roof suppor...

Страница 6: ...hole Please retain product label and instructions for future reference a a a a a a a Step 11 Now the roof has been fitted secure the building to the floor with 36x60mm screws Ensure to align the screws with the floor bearers 36x60mm Screws a Step 12 Cut the felt into 4x strips Roll the felt across the roof in the order shown in the illustration leaving approximatley 50mm of overhang at the front r...

Страница 7: ...he finial over the fascia joint and fix into place with 2x40mm screws 10x40mm Screws 40mm screw Pre drill hole Slave Door Locking Door 18 18 21 17 21 17 17 Please retain product label and instructions for future reference Step 15 Fix the cover trims around the building across the joints on each panel and at the corners using 3x30mm screws per trim 21x30mm Screws Step 16 Attach the turn buttons to ...

Страница 8: ...uards centrally above each window using 3x50mm screws per guard 18x50mm Screws Please retain product label and instructions for future reference 27 37 Step 18 Secure the larger rain guard above the doors fixing into place using 4x50mm screws ensure to screw into the framing above door 4x50mm Screws S IL IC O N E S E A L A N T Hint Silicone seal the back of each rain guard to help reduce water runn...

Отзывы: