34.
Position replacement top plate
on bottom and attach with 6 - 1 1/2”
nails.
35.
Position top door plywood over
door framing. Confirm it is evenly
positioned on door and attach with 12 -
1 1/2” nails. Position bottom door ply-
wood on door. Position tight under new
top cap and attach with 12 - 1 1/2” nails.
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 20
Parts
13B - Top Door Plywood
(3/8” x 31 3/8” x 29 3/16”h)
x 1
14B - Bot. Door Plywood
(3/8” x 31 3/8” x 41 3/16”h)
x 1
Parts
12B - Top Plate for Bottom
Dutch Door
(3/4” x 3 1/2” x 31 1/2”)
x 1
Hardware
N1 - 1 1/2” Finishing Nails
x 6 total
3/8” overhang
Replace Top Plate
Hardware
N1 - 1 1/2” Finishing Nails
x 24 total
Top Plate
Flush