1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 17
28.
Lift up front center gable panel
and slide notch up against roof ridge
board.
29.
Once gable panel is aligned correctly, attach in 4
locations as illustrated above with 1 1/4: screws.
Locate front gable left panel side and position if front
corner against gable framing.
Parts
10B - Front Gable Center Panel
(45 1/4”w ” x 27 1/2”)
x 1
Hardware
S2 - 1 1/4” Screws
x 4 total
Notch
Parts
11B - Front Gable Left Panel
(45 1/4”w ” x 19 1/4”)
x 1
Gable siding overhangs wall siding
Pre-drill siding
with 1/8” drill bit.
Left Front Gable Panel
There are matching sets of
front and rear gable panels.
They are interchangable for
Steps 28-32.