background image

Regular Maintenance & Tips to prolong the life of your shed.

Before/During Assembly:

 

 1.) Paint each face and edge of your plywood floor with a latex exterior paint. 
 2.) Caulk wall seams if gaps appear. 
 3.) Caulk around window framing. 
 4.) Caulk perimeter between floor plywood and bottom wall plate. 
 5.) Caulk channels in lap siding at the top of your door above the trim, just a drop in each channel. 
 6.) Caulk edge of door threshold (if applicable). 
 7.) Optional: Install a Sill Gasket between floor runners and foundation. 
 8.) Optional: Install an 8” strip of roofing paper below Cedar Ridge Caps for Cedar Roof Sheds.

Routine Maintenance:

 

 - Routinely check all fasteners are tight (ex. Door Hinges, Nails) 
 - Brush off dirt from walls. 
 - Brush off snow from roof regularly. 
 - Routinely remove needles and leaves from roof.

Painting/Staining

 

 - Your cedar shed, if left untreated, will weather to a silvery grey colour. 
 - Painting or staining your structure is highly recommended and will prolong the life of your shed. 
 - You do not need to wait to paint or stain your shed, the wood in your kit has been dried and can be 

stained or painted immediately. 

 - Consult your local paint store for the best paint or stain for cedar. 
 - Optional: stain the inside of your shed. (Note: this will remove the fresh cedar smell.)

1.

2.

3.

4.

5.

6.

7.

Sill Gasket

Floor Joists

Floor Runner

Foundation

8.

Floor Plywood

Wall Panel

Small gap between 
bevel siding and 
window trim

Dab of caulking

Strip of roofing paper over 
apex of roof panels

  Toll Free 1-888-658-1658              www.outdoorlivingtoday.com        [email protected]

Page 6

Содержание SpaceSaver SS124-SLIDER-METAL-AK

Страница 1: ...d with Sliding Doors Please take the time to identify all the parts prior to assembly Safety Points and Other Considerations Our products are built for use based on proper installation on level ground...

Страница 2: ...on the type of foundation you will be using Concrete slab or 4 6 inches of crushed gravel with paver stones or 4x4 stringers You can nd the footprint for your shed on Page 3 of your Assembly Manual I...

Страница 3: ...of floor frame Saves money on materials easy to level and work with Gravel with Patio Paver Stones Excavate at least 6 deep and 6 wider than floor frame on each side 1 2 Cubic Yards of gravel required...

Страница 4: ...ts Left Right 3E 1 x 3 x 45 Rear Soffit Center Roofs 3G 3 3 4 x 3 x 45 1 2 Roof Battens Center 3H 6 3 4 x 3 1 2 x 50 Roof Battens Outside 3J 2 x x 51 Facia Nailing Strips 3K 5 Metal Roof Panels 39 w x...

Страница 5: ...g is damaged Foam Enclosures Several Strips Step 41 Steps 61 62 64 56 60 S1 2 1 2 Screws S4 3 Screws Y2 90 Metal Bracket Roof x 4 x 250 x 28 x 190 x 305 S2 1 1 4 Screws N1 1 1 2 Finishing Nails BR1 Sq...

Страница 6: ...s Brush off dirt from walls Brush off snow from roof regularly Routinely remove needles and leaves from roof Painting Staining Your cedar shed if left untreated will weather to a silvery grey colour P...

Страница 7: ...will be 141 1 2 wide x 45 1 2 deep Attach frames together with 6 2 1 2 Screws Hardware S1 2 1 2 Screws x 16 total 1 Lay out 1A Floor Frame and two 1B Floor Joists as illustrated above Position the ce...

Страница 8: ...aution Be careful when laying floor down not to bend or twist floor Note Having a level foundation is critical Choosing a foundation will vary between regions Typical foundations can be concrete pads...

Страница 9: ...f all parts necessary to complete the Wall Section Identify all parts prior to starting Angled Wall Extenders 2pcs Part 2G Side Rear Wall Panels 5pcs Part 2A Bottom Wall Plates 5pcs Part 2B Front Wall...

Страница 10: ...panel is facing up or down Recently attached Bottom Plate is on bottom of panel Outside 2x3 framing of wall panel should be positioned flush with the outside of floor framing when properly aligned 9 T...

Страница 11: ...joists Wall siding should overhang floor by approximately 3 4 When positioned correctly attach both side wall panel studs together as per Step 10 10 Position rear solid wall into place on plywood floo...

Страница 12: ...Place Front Walls so wall framing is flush with floor frame and siding overhangs Attach with 3 2 1 2 Screws per panel as per Steps 10 12 12 Complete remaining side wall attachment as per Steps 10 11...

Страница 13: ...top Align flush outside with wall siding 15 Attach 2D Door Header Short to other side Position and attach 2E Door Header Long between short door headers The Long Door Header has an aluminum strip atta...

Страница 14: ...xtender will overhang and cover siding of side wall Parts 2G Angle Wall Extenders L R 2G 45 1 2 wide x 2 2F Top Triangular Siding Piece 2F Left Right x 2 Hardware N1 1 1 2 Finishing Nails x 6 total 17...

Страница 15: ...t protects overhanging siding on upper walls from damage Please remove before installing Overhanging siding Protective cleat 19 Complete opposite Angled Wall Extender positioning and attachment as per...

Страница 16: ...shown above Align with top framing of front walls Attach with 4 2 1 2 Screws To complete Wall Section attach bottom 2x3 wall plates to plywood floor with 2 2 1 2 Screws per wall section Prior to secu...

Страница 17: ...proximately 142 1 4 More importantly if measurements are not within 1 4 your walls are not square Center Roof Battens 3pcs Part 3G Metal Roof Panels 5 pcs Part 3K Rear Soffits L R 2pcs Part 3D Rafters...

Страница 18: ...ront Rear 141 1 2 Parts 3A Rafters 1 1 2 x 2 1 2 x 54 x 9 3B Front Soffits Sides 1 x 3 1 2 x 48 x 2 3C Front Soffit Center 1 x 3 1 2 x 45 1 2 x 1 3D Rear Soffits Sides 1 2 x 3 1 2 x 48 x 2 3E Rear Sof...

Страница 19: ...will sit approximately 1 8 away from wall siding This can vary slightly 25 Carefully flip completed Rafter Section over so Front Soffit is facing the front and place on SpaceSaver walls Note Double ch...

Страница 20: ...With outside rafters properly secured attach remaining interior rafters using 1 2 1 2 Screw per rafter end at the front of the shed Screw into rafters from inside of Header on an angle Hardware S1 2 1...

Страница 21: ...tside 1 45 1 2 Center Position on front of roof rafters Place 1 8 back from end of rafter Batten will sit evenly on center rafters overhanging 2 on the outside rafters Attach batten with 1 1 1 4 Screw...

Страница 22: ...when you attach side facia 34 Position and attach 3rd row of Battens 3G and Batten Spacers following Steps 31 33 Space battens such that they are flush with the previous row of Batten Spacers as shown...

Страница 23: ...Batten approximately where the center of the first Panel will be Place the first Metal Roof Panel on Battens Do not fasten Panels down until Steps 40 42 Place other two Metal Roof Panels with Hangers...

Страница 24: ...nd of Battens can vary from 1 3 depending on your personal preference 39 Once Metal Roof is spaced correctly from side to side and top to bottom lift panels up and run a bead of caulking down the over...

Страница 25: ...center of Battens Ten more 2 Metal Screws will be required to further secure Metal Roof Panels and to complete Metal Ridge Caps in later steps Remove Metal Roof Hangers Insert Foam Enclosures 41 Befo...

Страница 26: ...ot to overtighten Tighten middle row be careful not to overtighten 42 Using 5 2 Metal Screws and 1 4 Nut Driver secure Metal Roof Panels down to lower front Batten row Tighten screws in middle Batten...

Страница 27: ...ner Trim Part 4P Rear Corner Trim Part 4O Rear Corner Filler Trim Part 4D Front Corner Filler Trim Part 4C Side Rear Bottom Skirting Part 4A Side Front Corner Trim Part 4N Front Corner Trim Part 4M Lo...

Страница 28: ...rdware N1 1 1 2 Finishing Nails x 12 total Skirting meets flush 46 Position and attach 4C Front Corner Filler Trim with 4 1 1 2 Finishing Nails per piece Filler trims won t be visible because they ser...

Страница 29: ...cks should meet at the center of the door opening below middle rafter Attach with 8 1 1 4 Screws per track Parts 4E Aluminum Door Track x 2 Hardware S2 1 1 4 Screws x 16 total 3 8 Gap between Track an...

Страница 30: ...s meet in the middle Left Side Door Parts 4F Sliding Doors 36 x 73 x 2 Right Side Door Twist Roller Cart onto bolt After doors are hung you may need to adjust this until doors hang straight up and dow...

Страница 31: ...of bottom skirting Door Tracks rest on Long Floor Runners Bottom of Door Stops and Door Tracks should be flush with each other Secure Door Tracks to shed with 6 3 screws per piece Secure Door Stops w...

Страница 32: ...doors can not slide out of the track Secure each piece of Track Cover with 4 2 1 2 screws Parts 4I Lower Door Track Cover 3 4 x 3 1 2 x 44 1 4 x 3 Hardware S1 2 1 2 Screws x 12 total Door Stop and Tr...

Страница 33: ...door frame and attach with 5 1 1 4 Screws Parts 4G Interior Door Flange 3 4 x 3 1 2 x 71 1 2 x 1 Hardware S2 1 1 4 Screws x 5 total Left Side Door Left Side Door Right Side Door Door Flange attaches...

Страница 34: ...g Nails aligning at bottom with wide trim Parts 4M Front Corner Trims 1 2 x 5 1 2 x 78 1 2 x 2 4N Side Front Corner Trims 1 2 x 2 1 2 x 80 x 2 Hardware N1 1 1 2 Finishing Nails x 32 total 5 1 2 tight...

Страница 35: ...fter ends and Side Facia goes against Facia Nailing Strip Align so the Front Facia caps the Side Facia Attach Front Facia with 2 1 1 2 Finishing Nails per rafter end Attach Side Facia to the Facia Nai...

Страница 36: ...per rafter end 59 Attach 4R 4S Rear Facia onto rafter ends as per Steps 56 58 Small gaps may occur between the Center and Left Right Facia these will be covered by Rear Metal Drip Caps in Step 61 Rea...

Страница 37: ...ce from side to side allowing caps to overlap each other Overhang the cap approximately 1 past each end When ridge cap is correctly positioned secure with 5 2 long Self Tapping Metal Screws as per Ste...

Страница 38: ...rge amount Trim dado sits in flange 63 Position 4W Window Trim around window doing a dry run first and attach with 4 1 1 2 Finishing Nails per piece Window trim has a small dado on reverse face Outsid...

Страница 39: ...ustomer Service 2 On Time Shipping 3 Motor Freight Delivery 4 Quality of Materials 5 Assembly Manual 6 Overall Satisfaction Toll Line 1 888 658 1658 Fax 1 604 462 5333 sales outdoorlivingtoday com The...

Отзывы: