Outdoor Living Today www.outdoorlivingtoday.com [email protected]
Page 9
3.
With Wall Plates properly attached, orientate completed Walls around the Floor. Be sure to leave
room to work.
Front Narrow Walls
will be required in this section.
Front
Rear Wall Panels
Front Narrow
Walls
Front
Left Side W
all Panel
Wall frame flush with outside
of Floor on the side. Wall
siding will overhang Floor.
Left Side Wall
4.
Starting with
Left Side Wall
, lift up and position so framing is flush
with Floor at both front and rear of shed. Make sure Wall frame is flush
with outside of Floor on the side. When Wall is positioned correctly,
secure Bottom Wall Plate to Floor with
4 - 2 1/2” Brown Screws.
Rear
Bottom W
all Plate
Before completely
attaching walls to floor
(Steps 6-10), c
heck to
make sure door opening is
45” wide. See
Step 15
for illustration.
Hardware (Steps 4 - 8)
2 1/2” Brown Screws
x 25 total
4 - 2 1/2” Brown Screws
Wall frame flush
with outside of
Floor at the front.
Wall frame flush with
outside of Floor at
the rear.
Side Wall Panel
Side Wall Panel
Floor