![OLT GS63-TG-METAL Скачать руководство пользователя страница 16](http://html1.mh-extra.com/html/olt/gs63-tg-metal/gs63-tg-metal_assembly-manual_3871821016.webp)
Outdoor Living Today www.outdoorlivingtoday.com [email protected]
Page 16
24.
Storage Shelf positioning is flexible so decide what height configuration suits your needs.
Gather your
Storage Shelf Supports.
The short Support (12 1/2”) attaches to the Narrow Wall, the
long (35”) to the Rear Wall. Position using a Level, and drill Pilot Holes to prevent ends of
Supports from splitting. Attach first Support using
2 - 1 1/4” Screws
. Place
Storage Shelf
on
attached Support, Level, and mark position of second Support. Pilot Hole and secure second
Support.
Storage Shelf
Rear Wall
Side Wall
25.
Place
Storage Shelf
on top of supports and secure with
4 - 1 1/2” Finishing Nails.
Complete
2nd Shelf (if desired) as per
Steps 24 & 25.
Storage Shelf Support
Parts (Steps 24 - 25)
Short Storage Shelf Supports
(3/4” x 2 1/2” x 12 1/2”)
x 2
Long Storage Shelf Supports
(3/4” x 2 1/2” x 35”)
x 2
Storage Shelves
(11 1/2” x 31 7/8”)
x 2
Hardware Parts (Steps 24 - 25)
1 1/4” Brown Screws
x 8 total
1 1/2” Finishing Nails
x 8 total
23.
Locate
Rear Top Plate
and place on top of Rear Walls. With Rear Top Plate positioned evenly
and flush against Rear Wall framing, secure using
6 - 2 1/2” Brown Screws
screwing down from the
top of Rear Top Plate down into the Rear Wall top plates.
Parts
Rear Top Plate
(1 1/2” x 1 1/2” x 70”)
Hardware
2 1/2” Brown Screws
x 6 total
Rear Wall
Top Plate
2 1/2” Brown Screws