70.
Position and attach
Interior Vertical Door Flange
(1/2” x 2 1/2” x 70”)
on inside door frame
(left door from outside/right from the inside)
using 6 - 1 1/4” screws. Position on inside edge of left
door frame so Flange overlaps right door frame by about 3/4”.
Leave small gap
between Stop
and Flange.
67.
Attach 2nd upper interior door trim as per
Step 66
. Position and attach all
Side Interior Door Trim (4)
(1/2” x 1/2” x 35 7/8”) 2 per/side. Position against door
jamb and underneath upper door trim. Attach with 4 - 1 1/2” finishing nails. Complete
lower interior door trim and both side interior trims on other side.
Lower
interior
door trim.
68.
Attach
Upper Door Stop -
dado cut
(1 1/2” x 2 1/2” x 6”)
underneath door header with
2 - 2 1/2 screws. Stop is pre-drilled
on angle. Evenly space between trim.
Door T
rim
Door Stop
has dado cut.
69.
Attach
Lower
Door Stop /Floor
Threshold
(3/4” x 2 1/2” x 64”) -
between door jambs. Check door align-
ment first and then attach with 4 - 1 1/4”
screws.
Optional
- caulk the lower edge
of threshold to prevent water penetration.
Stop aligned
under trim.
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 31