48.
Attach
Corner Filler Trims
where gaps exist in rear corners (2 per side). Hammer with 8 - 1 1/2”
finishing nails. Position bottom filler just below wall siding. Top filler just below soffit. Gap in middle.
49.
Position and attach Corner Filler Trims in the front as per
Step 52.
There is an additional 10” long
Front Center Corner Filler Trim
that you will need to center and attach as well using 2 - 1 1/2” nails.
50.
Locate
Vertical Door Trim
(2 - 1/2” x 3 1/2” x 77 1/2”). Position Door Trim flush with outside of
narrow wall stud. Trim should be aligned just beneath Door Header. Attach with 8 - 1 1/2” finishing nails.
Flush with
Narrow Wall
stud.
Vertical
Door Trim.
Gaps to be
covered.
Wall Siding
Flush with
bottom of
Door Header.
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 25